He says: "all the engineering is basically done and the Arctic rig concept is close to completion, so it is really only a matter of finding the right prospect and the right client."
他说:“目前,关于制造该钻井船的准备工作基本完成,设计方案也已接近尾声,最后的一步就是要寻找一个好的发展前景和适合的用户。”
Shorter completion times and enhanced well productivity in shale basins contributed to sustained higher production levels amidst a dramatically lower rig count in 2009.
在2009年更短的完成时间和在页岩水池的改进的好的生产力造成在显著更低船具计数之中的被承受的更高的生产水平。
Stop for 15-40min (depending on the depth of holes) after completion of drilling, and use the drilling rig to get out the impurities such as sand, etc. settled without controlling the mud.
钻进完成后,停15-40分钟后,(根据孔深决定时间)用钻机打捞一次沉降下去的砂子等杂质,不要控浆。
应用推荐