How will the SOA COE interact with project teams?
SOA卓越中心将如何与项目团队来往?
Select the appropriate project in the Associate with project area.
在Associate with Project区域中选择适当的项目。
Confirm set pressure with project engineer or boiler plant personnel.
请与项目工程师或锅炉厂人员确认设置压力。
Here you replace one-size-fits-all state transitions with project-defined activity sets.
这里您用项目定义的行为设置来取代一成不变的状态转换。
Dialog with project decision-maker!
与项目决策人对话!
Keep close cooperation with project groups and Litho group.
与项目研发组、光刻组密切合作。
Cost calculation for each project, compare the actual cost with project target cost.
核算项目成本,并比较实际成本与项目目标成本的差异。
B. Remove costs associated with project team communications, meetings, and customer reviews.
除去与项目团队沟通、会议和用户审核的费用。
With DVCS, every user has their own local repository, complete with project history, branches, etc.
在DVCS中,每个用户都有她们自己的本地仓库,其中完整包含了项目历史和所有分支等。
On large projects, hundreds of workers may be directly or indirectly involved with project execution.
在大型的项目中,成百上千的工人会直接或间接地参与到项目的执行中。
Requirements are managed and inconsistencies with project plans and work products are identified.
管理需求并且识别出需求与项目计划、工作产品不一致的地方。
Participates in product design meetings for familiarization with project requirements and objectives.
参与产品设计会议以熟悉工程项目的需要和目标。
As reuse engineers work with project teams they can capture the capabilities that project teams need to deliver.
重用工程师通过与项目团队协作,可以捕获项目团队需要提供的功能。
Coordinate with project leader and financial team to ensure on time delivery of samples and payment collection.
与项目负责人和财务团队协调,确保样品准时交货和收款。
Reuse engineers with SOA skills who work with project teams can lower the barriers to adoption of SOA by those teams.
具有SOA技能的重用工程师通过与项目团队协作,可以降低这些团队采用SOA的壁垒。
Co-operate with project managers and product design engineers to plan, control and track the engineering projects.
配合项目经理和产品设计工程师,计划,管控和追踪工程项目。
Design Department, in fact an engineering design institute, deals with project design drawings and product designs.
实为工程设计院,主要负责项目工程的图纸设计和产品设计。
For example, you can create a common glossary to discuss the system with project stakeholders, users, and team members.
例如,可以创建常用词汇表来与项目负责人、用户和团队成员讨论系统。
The paper introduces the calculation methods of extension of prestressed reinforcement combining with project instance.
本文结合工程实例,介绍预应力钢筋张拉时理论伸长值的计算方法。
Combining with project practice, this paper introduces checking method of grit road foundation solidness in super road project.
结合工程实例,详细介绍天然砂砾在高等级公路工程中路基压实度的检测方法。
In new curriculum, the emphasis on integrative and interdisciplinary learning happens to share the same view with project-based learning.
在新课程的结构设置中,强调综合性,注重学科间的联系,这与项目学习的思想是不谋而合的。
Explain the benefit of actual information, and clearly show the correlation between estimates and the risks associated with project overruns and failure.
说明实际信息的好处,并清楚地说明评估和风险(与项目超限及失败相关联)之间的关系。
Monitors and IMs are some of the quickest ways to send build status feedback, and I'm familiar with project teams that exclusively use these mechanisms.
监视程序和IM是两种最为快速的发送构建状态反馈的方式,我很熟悉一些专门使用这些机制的项目团队。
To make the best use of the help system, you should add your own content to it, with project - and team-specific notes added to the standard help entries.
为了确保更好地使用帮助系统,您应当将自己的内容添加到此系统中,方法是将特定于项目和小组的通知添加到标准的帮助条目中。
And the functions of real-time monitoring, long-range controlling, accident alarm, failure analysis, and so on can be carried out together with project case.
本文对变配电站智能监控系统的构成、特点、设计思路及内容进行了叙述,并结合工程实例再现其实时监控、远程控制、事故报警及故障分析等功能。
The really interesting problems in your domain will require considerable thought, collaboration with project stakeholders, multiple iterations, and real end user feedback.
领域中真正有趣的问题是需要经过深思熟虑的,需要与项目利益相关者协作,还需要多次迭代和最终用户的反馈。
The really interesting problems in your domain will require considerable thought, collaboration with project stakeholders, multiple iterations, and real end user feedback.
领域中真正有趣的问题是需要经过深思熟虑的,需要与项目利益相关者协作,还需要多次迭代和最终用户的反馈。
应用推荐