• Dad doesn't like heights, so he stayed at the bottom of the tower and took pictures from the ground.

    爸爸不喜欢高处,所以他呆在塔的底部,在地面上拍照。

    youdao

  • I stayed in student dorms in Swedish university towns and plush colonial-era houses in Madrid via communist-built tower blocks on the outskirts of Wroclaw in Poland.

    我曾经住在瑞典大学城的学生宿舍里,马德里一间殖民时期房子里的一张豪华沙发上,以及波兰弗罗茨瓦夫郊外的一幢公共高层住宅。

    youdao

  • It is believed that the crossing will form the world's longest single-tower, asymmetric cable-stayed bridge.

    据说,它将成为世界上最长的单塔不对称斜拉桥。

    youdao

  • Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.

    独塔不对称斜拉桥由于其不对称性,使得其合理成桥状态和合理施工状态的确定显得更为复杂。

    youdao

  • Binzhou Yellow River bridge, which is a three-tower prestressed concrete cable-stayed bridge, applies the C55 concrete in the towers.

    滨州黄河大桥主桥是三塔预应力混凝土斜拉桥,桥塔采用C55高性能混凝土。

    youdao

  • Anchorage zone of pylon, which is a key part of cable-stayed bridge, can pass local concentrated cable force to the tower column safely and uniformly.

    索塔·拉索锚固区是斜拉桥中的关键部位,其作用是将拉索的局部集中力安全,均匀地传递到塔柱。

    youdao

  • The static characteristics of the single pylon cable-stayed include the internal force and deformation of main girder, reaction force, force and deformation of the main tower.

    独塔混凝土斜拉桥的静力特性主要包括主梁受力及变形、支座反力、主塔受力及变形、拉索受力。

    youdao

  • Binzhou Yellow River bridge is a three-tower cable-stayed bridge with prestressed concrete girders.

    滨州黄河大桥主桥是三塔预应力混凝土斜拉桥,主梁为预应力混凝土箱梁。

    youdao

  • The buffeting performance of the free-standing tower of Zhanjiang Bay Bridge, a long-span cable- stayed bridge, under yaw wind is investigated by means of wind tunnel test of aeroelastic full model.

    通过气弹全模型试验对斜风作用下湛江海湾大桥裸塔抖振响应性能进行了研究。

    youdao

  • In construction of cable tower of cable-stayed bridge, whole vertical-rotation lifting method can reduce difficulty in assembly of cable tower structure at high altitude.

    采用整体竖转的施工方法进行斜拉索桥倾斜索塔的吊装,可降低索塔结构的高空拼装工作难度。

    youdao

  • Abstract: Shanghai MinPu two bridge for single tower and double cable plane steel truss cable-stayed bridge of the composite beams.

    摘要:上海闵浦二桥为独塔双索面钢板桁组合梁斜拉桥。

    youdao

  • Finally, the calculation of the effective length of the tower and main girder for a certain steel cable-stayed bridge is illustrated.

    本文例举了一座钢斜拉桥塔柱、主梁自由长度及其稳定性的计算。

    youdao

  • The Changxing harbor bridge in Zhejiang is a prestressed cable-stayed bridge with two tower and single-cable-plane.

    浙江长兴港大桥是一座双塔单索面预应力混凝土矮塔斜拉桥。

    youdao

  • Xiamen Yinhu bridge is a partially cable-stayed prestressed concrete bridge, whose pier, tower and beam are consolidated together.

    厦门同安银湖大桥是国内第一座使用环氧全涂平行钢绞线斜拉索的预应力混凝土部分斜拉桥,墩塔梁固结体系。

    youdao

  • In this paper, an example of Shawan Bridge static load experiment has been shown to introduce a general way of Short Tower Cable-stayed Bridge static load experiment.

    本文以沙湾特大桥为例介绍了矮塔斜拉桥静载试验的一般方法。

    youdao

  • There are few RC single-tower cable-stayed bridges with connected tower and separated decks in internal and international bridge engineering.

    混凝土独塔斜拉桥采用联塔分幅的结构型式在国内外均属少见。

    youdao

  • We stayed in a dozen-story building according to the plan. It was a representative office of China Technology Importation Company, with a balcony facing the Eiffel Tower.

    我们按住进了一栋十几层高的公寓,是中技公司驻法代表处,在阳台上可以看到埃夫尔铁塔。

    youdao

  • Nanjing Third Yangzi River Bridge is the first cable-stayed bridge in China of which the main tower is in the form of steel structure.

    南京长江第三大桥是我国第一座主塔采用钢结构形式的斜拉桥。

    youdao

  • Climbing-frame is often used in the high-tower construction of cable-stayed or cable-suspended bridge, but seldom used in common pier construction.

    爬架施工一般应用于斜拉桥或悬索桥的高塔塔柱施工,而很少用于一般墩身施工。

    youdao

  • Stemmed from Japan, for medium length spans (those between 100 meters and 200 meters), low tower cable-stayed bridge is fast becoming the bridge of choice.

    低塔斜拉桥是介于梁式桥和斜拉桥之间的一种桥型,适用跨度介于梁式桥和斜拉桥之间。

    youdao

  • It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.

    这是首次使用移动模架在建设共和斜拉桥主梁,这是一个单一的住宿表面,单塔斜拉桥的桥。

    youdao

  • It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.

    这是首次使用移动模架在建设共和斜拉桥主梁,这是一个单一的住宿表面,单塔斜拉桥的桥。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定