Project network technique is presently a frequently-used method to make project schedule plan.
目前,工程项目进度计划的编制多采用网络计划方法。
The results indicate that the simulation model can help project manager to prepare his risk management plan and schedule plan effectively and efficiently.
结果显示,该模型能够帮助项目经理制定风险管理计划和合理的进度计划。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Schedule, plan and organise adhoc/quarterly Board and other committee meetings in consultation with the shareholder representatives in Singapore.
与新加坡的股东代表进行协商安排,计划和组织临时性/季度性董事会及其他委员会会议。
With practical projects, authors introduce the construction method and principle, schedule, plan and technical points of the lifting construction of steel pipe arch truss segments.
通过工程实例,介绍了钢管拱桁架节段吊装施工的方法与原理、施工程序、施工布置及技术要点等。
With practical projects, authors introduce the construction method and principle, schedule, plan and technical points of the lifting construction of steel pipe arch truss segments.
通过工程实例,介绍了钢管拱桁架节段吊装施工的方法与原理、施工程序、施工布置及技术要点等。
应用推荐