So, the schedule plan base on such techniques deviates from the truth.
因此,通过这种方法做出的进度计划往往与实际情况有较大的偏差。
参考来源 - 基于模糊综合评价的工程项目进度管理研究·2,447,543篇论文数据,部分数据来源于NoteExpress
Project network technique is presently a frequently-used method to make project schedule plan.
目前,工程项目进度计划的编制多采用网络计划方法。
Once the schedule is developed, it should be baselined to provide a snapshot of the original schedule plan of the plan.
一旦计划表形成,它就要和原来的项目计划方案相一致。
This step is performed throughout the life of the project and ensures that the work results lines up with the schedule plan.
这一步是贯穿于项目始末的,它保证工作和计划相一致。