As the Project M design is developed, it will be chronicled on a dedicated website, located here.
随着项目的M设计开发,将记录在一个专门的网站,设在这里。
M. s or B. s with a life science or related specialty is desirable; better to have project management or finance work experience.
生命科学或制药相关的硕士或本科学历。有项目管理或财务相关工作经验者从优。
M: My boss gave me a big project. I had to have it finished by this morning.
M:我的老板给了我一个大项目,我必须在今天早上完成,真是够难的。
Mike is an accomplished SOA and Enterprise Architect, but M-Dot was his first major Cloud project.
Mike是个成熟的SOA与企业架构师,而M-Dot却是他的首个云项目。
M: the project leader quarterbacked the meeting.
现在我听清楚了,你刚才说的是:项目领导人主持会议。
Teams: as far as possible, you should work in teams of two unless you are doing the M-to-N fast file transfer protocol project.
团队:你应该尽可能与至少两位的小组成员一起合作,除非你做的专题是M到N快速档案传送通讯协定。
Our m + Project does exactly that, by literally emerging from the city's underground.
我们的M +计划正式如此,它字面上源自于这个城市的地下。
As far as possible, you should work in teams of two unless you are doing the M-to-N fast file transfer protocol project.
你应该尽可能与至少两位的小组成员一起合作,除非你做的专题是M到N快速档案广播通讯协议。
This paper introduces the basic concepts of project study, and taking company m as an example, introduces how to apply project study into the teaching of financial management course.
介绍了项目教学的基本概念,以M公司为例,详细介绍了如何将项目教学应用到财务管理课程教学中。
PHIL WATSON: Excuse me Big Boss I' m having some problems with the project.
菲尔.沃森:打扰一下,“大老板”,我在这个项目上有些“问题”。
AREP is a comprehensive design group with departments of project development study, architectural design, urban plan, landscape design, interior design, structure & M&E, cost estimates etc.
AREP公司具有项目前期策划,建筑设计,城市规划,景观设计,室内设计,结构机电工程技术,经济估算等专业部门,具有很强的综合实力与综合竞争力。
Genomics expert Howard Chang, M. D., assistant professor of dermatology at Stanford, and the paper's lead author, Eran Segal, Ph. D., joined the project in 2004.
基因组学专家、斯坦福皮肤病学助理教授HowardChang医学博士和该研究论文的重要作者EranSegal哲学博士于2004年加入了该计划。
By focusing on factors, such as development risk, user business values and stabilizing core architecture to relieve project risk, the method is applicable to projects which apply the UP m...
该方法关注开发风险、用户商业价值等因素,并通过在迭代中逐步稳定核心架构来缓解项目风险,适用于应用up模型的项目开发。
Mada s. p. a. m. claims all these roles in the conceptualization and execution of the Jade Valley project.
马达思班将在玉山项目的概念化及实施过程中,担当以上所有角色。
Then the situation of Taxus L. resource in Yunnan was discussed, which was used as background information for forming the project, experiment and demonstration of afforestation and m...
此后,论述了云南省的红豆杉资源状况,以作为“云南红豆杉药用人工林营造技术试验示范”的立项背景。
Then the situation of Taxus L. resource in Yunnan was discussed, which was used as background information for forming the project, experiment and demonstration of afforestation and m...
此后,论述了云南省的红豆杉资源状况,以作为“云南红豆杉药用人工林营造技术试验示范”的立项背景。
应用推荐