The Test Form dialog shows the result of the test operation. Figure 9 illustrates this
TestForm对话框显示测试操作的结果。
Red and black tree algorithm test operation.
红黑树的算法试验作业。
Purpose: To test operation of pressure differential relief valve.
目的:检测差压安全阀的工作性能。
Load disturbance test and AGC test were carried out during test operation.
在试运期间进行了负荷扰动试验和电网AGC试验。
The test operation proved that the performances of the facility are satisfactory.
试验运行表明,装置工作性能良好。
The test operation proved that the performances of the facility are satisfactory.
试验运行表明,装置工作性能良好。
应用推荐