• Switch back to the Events tab, enter test data, then press Continue (Figure 40).

    切换Events选项卡输入测试数据然后Continue40)。

    youdao

  • Switch to the Performance Test perspective and open a test log.

    切换PerformanceTest视角打开一个测试日志。

    youdao

  • Save the changes and switch back to the Diagram view to run a quick test.

    保存更改切换Diagram视图运行一个快速测试

    youdao

  • Switch back to the Test perspective.

    切换Test视角

    youdao

  • Press the belt switch, the whole test run.

    传送带开关,进行整机试运行。

    youdao

  • The application of phase selection close switch in low voltage electrical apparatus test was introduced.

    介绍了低压电器产品试验中选合闸开关应用

    youdao

  • LAN Switch hardware design and test technology has successfully paced into industrial phase.

    目前该交换机单板硬件设计测试技术进入产业化阶段

    youdao

  • The algorithm can be extended to test time switch networks.

    算法推广到T接线器网络的测试

    youdao

  • Set "AKB" test switch to test position.

    AKB测试切换测试位置

    youdao

  • Set "AKB" test switch to test position.

    AKB测试切换测试位置

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定