Switch back to the Events tab, enter test data, then press Continue (Figure 40).
切换回Events选项卡,输入测试数据,然后按Continue(图40)。
Switch to the Performance Test perspective and open a test log.
切换至PerformanceTest视角并打开一个测试日志。
Save the changes and switch back to the Diagram view to run a quick test.
保存更改并切换回Diagram视图,运行一个快速测试。
Switch back to the Test perspective.
切换回Test视角。
Press the belt switch, the whole test run.
按下传送带开关,进行整机试运行。
The application of phase selection close switch in low voltage electrical apparatus test was introduced.
介绍了低压电器产品试验中选相合闸开关的应用。
LAN Switch hardware design and test technology has successfully paced into industrial phase.
目前该交换机单板硬件设计及测试技术已进入产业化阶段。
The algorithm can be extended to test time switch networks.
该算法还可推广到T接线器网络的测试。
Set "AKB" test switch to test position.
集“AKB ”测试切换到测试位置。
Set "AKB" test switch to test position.
集“AKB ”测试切换到测试位置。
应用推荐