• This paper presents Shanghai ATM broadband switch test network including network configuration, the basic equipment and application systems.

    本文介绍了上海ATM宽带交换试验的网络组成,组网主要设备以及主要应用系统

    youdao

  • This article presents the content, method and process of auto engine starting system test. This paper introduces many means and circuits of no-load test, overall braking test and solenoid switch test.

    提出汽车发动机启动系统测试内容方法步骤介绍空载试验制动试验电磁开关试验方法线路

    youdao

  • Switch your console output to the test server process.

    控制台输出切换测试服务器进程

    youdao

  • If for example you switch workspaces frequently, and forgot to remove projects from previous workspaces, you could rest the Unit Test Environment back to its initial state.

    例如如果经常切换工作区并且忘了先前的工作区中删除项目,您可以单元测试环境恢复初始状态

    youdao

  • Want to switch from development to test or production databases and schemas, and continue to get instant SQL validation?

    希望开发数据库模式切换测试生产数据库和模式,继续使用直接的SQL检验?

    youdao

  • You learned how you can switch between development and test databases, and still continue to get SQL validation for either of the databases.

    学习了如何开发数据库测试数据库之间切换针对这两个数据库进行SQL检验

    youdao

  • When your test has started to run, switch to the integration test client that is running in attach mode.

    测试开始运行切换附加模式下运行集成测试客户端。

    youdao

  • There are many situations in which you want to be able to easily switch the endpoint of the service being called; one is as you move from a development environment to a test environment.

    许多情况下,希望能够方便地切换调用服务端点其中一种情况是从开发环境转移测试环境。

    youdao

  • ACT doesn't appear to have a global setting to switch to HTTP 1.1 so the test will sends the additional header.

    ACT似乎没有切换HTTP 1.1的全局设置所以测试无法发送这个请求头。

    youdao

  • After the project containing the HATS web service is running in the internal test environment, switch back to the EGL Rich UI perspective and click the Preview TAB.

    包含HATSWeb服务这个项目运行内部测试环境后,切换egl RichUI透视图单击preview选项卡。

    youdao

  • Login to the portal and switch to the Test page Group. You should see a page labeled Edit Demo page.

    登录门户切换TestpageGroup

    youdao

  • If you switch tabs to the Test environment TAB (as shown in Figure 8), you see a different view, which will eventually contain each environment that you want to cover.

    如果切换TestEnvironment项时(如图8所示),您可以看到不同景象最终包含将会碰到的每一个环境。

    youdao

  • Now switch to NUnit and note that the treeview's nodes are all grey, indicating that the test cases have not yet been run for the program you've just updated.

    现在再切换NUnit注意Treeview所有节点均为灰色,这表明更新后程序没有运行

    youdao

  • Before starting the second instance, we would see the footprints normalized, (I switch to the process boe_fcprocd, as I couldn't get WIReportServer to start for this LIBPATH test).

    启动第二实例之前,我们看到内存占用恢复正常了(改用进程boe_fcprocd,因为这项LIBPATH测试中无法启动WIReportServer)。

    youdao

  • If we can use her DNA to find that mutant gene then we can test it in laboratory animals to see if we can switch if off and slow down the ageing process at will.

    如果我们能够DNA当中发现变异基因,我们可以其他动物身上试验这些基因,我们能否任意减缓老化过程。

    youdao

  • Both the Engine (and Editor) can easily switch between them which will allow you to work on multiple games at once or have several test projects in addition to your main game project.

    可以很容易引擎(编辑器)之间切换除了游戏项目之外,允许多个游戏工作几个测试项目之间进行切换。

    youdao

  • Inspect, record and operate high voltage equipments status, regular turn over high voltage wire and test high voltage switch.

    检查记录操作高压设备状况定期转换高压线路切换试验操作。

    youdao

  • Make sure to test both ways from each physical server, as switch ports can be mis-configured for inbound and outbound per port.

    确保测试每个物理服务器的双向通信,因为交换机每个端口的入站出站通信可能配置有误。

    youdao

  • In the industry test is realized to successfully complete the switch from VF to WF, the switch current greatly decrease.

    现场工业试验成功实现了大功率电机变频工频的平稳切换,切换电流大大减小。

    youdao

  • Well, for testing purposes, you can just use ipa-test-interpreter switch in compiler Settings and it will run the same way like on the Android or the BlackBerry Tablet OS.

    那么出于测试目的只需使用编译设置的ipa - test -interpreter开关就会运行AndroidBlackBerryTabletOS上的一样。

    youdao

  • Isolated relays, such as those used in the Model 7013 relay Switch Card, can be used to control certain test system requirements, such as the conveyor.

    隔离继电器例如7013行继电器开关卡使用继电器,用来控制特定测试系统要求,例如传送带

    youdao

  • Test and set switch gear and circuit breaker relays for proper coordination.

    开关柜断路器继电器配位是否正确进行测试设置

    youdao

  • Test and set switch gear and circuit breaker relays for proper coordination.

    开关设备断路器继进行设定检查是否配合正确

    youdao

  • Ir measurements often involve multiple conductors, so a switching system is often required to switch the picoammeter and the source to all the conductors in the test circuit.

    由于IR测量往往涉及到导线所以通常需要切换系统皮安切换至测试电路中的所有导线。

    youdao

  • The test expresses that it is possible to adjust power by combination switch in resistance welding transform.

    通过试验证实组合开关变压器中用作功率调节可行的。

    youdao

  • A disadvantage of the cascade configuration is that the signal may pass through more than one switch contact to the device under test, causing higher losses in the signal.

    配置一个缺点信号经过多个开关触点才能到达被装置会造成信号损耗更高

    youdao

  • Verify that "AKB" test switch makes only minor changes in screen appearance.

    确认AKB测试开关使得只有微小变化出现屏幕上

    youdao

  • Verify that "AKB" test switch makes only minor changes in screen appearance.

    确认AKB测试开关使得只有微小变化出现屏幕上

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定