Construction phase: Manage schedule risk.
构建(Construction)阶段:管理进度风险。
RUP's Construction phase is directed at managing schedule risk.
RUP的构建阶段瞄准进度风险的管理。
Or if the existing service is leveraged, it will increase schedule risk.
或者利用现有的服务会增加进度风险。
Project management: Cost, schedule, risk, staffing, and so forth.
项目管理:成本、时间表、风险、人员分配等等。
Prepare project management for some project, control project schedule, control project cost and down project risk.
参与部分项目的项目管理工作,把控项目进度,控制项目成本,降低项目风险;
Project cost and schedule cannot be finalized without completing risk management.
没有完成风险管理之前,项目成本和进度无法最终确定。
For example, a proposed schedule change will often affect cost, risk, quality, and staffing.
例如,一个被提议的进度变更常会影响成本,风险,质量和人员构成。
The construction schedule is only a plan, which always has risk.
施工进度计划只是一个计划,总存在风险。
Support for calibration, measurement system analysis, risk assessment, maintenance schedule, spare parts.
支持工程师进行新设备的校准、系统分析,风险评估,保养计划及零部件清单。
The Company refers the Customer to the Risk Disclosure Statements in Schedule 5.
本公司邀请客户参阅载于附表5的风险披露声明。
Strategy, Schedule, and Risk Assessment, Basic Physics.
对策,进度,风险评估,基本物理学。
You should read the General Risk Disclosure Notice at Schedule 2.
客户应阅读附件2中的一般风险披露通知。
You should read the General Risk Disclosure Notice at Schedule 2.
客户应阅读附件2中的一般风险披露通知。
应用推荐