Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
Case study shows that the resource reallocation model considering schedule risk factors is reasonable.
结果表明,考虑进度风险因素的优化模型是科学合理的。
Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.
因此,在研发项目实施之前开展进度风险分析十分必要。
The schedule risk is an important risk during new equipment development, which correlates with plan technique and other factors.
进度风险是新装备研制面临的重要风险之一,它与计划、技术等因素密切相关。
Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。
Facilitating communication regarding the project scope, schedule, risk, performance, cost etc with the stakeholders throughout the project life cycle.
便于在整个项目生命周期中,对项目范围,进度,风险,绩效,成本等问题与项目干系人沟通。
This thesis on 165mn press installation project quality, schedule, risk control, thus pointing out the general process of installing a large press, and the installation of process control.
本论文通过对165MN压机安装项目中质量、进度、风险控制的论述,揭示大型压机安装的一般性过程,以及在安装过程中的项目控制方法。
This thesis on 165mn press installation project quality, schedule, risk control, thus pointing out the general process of installing a large press, and the installation of process control.
本论文通过对165MN压机安装项目中质量、进度、风险控制的论述,揭示大型压机安装的一般性过程,以及在安装过程中的项目控制方法。