• Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.

    运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。

    youdao

  • Case study shows that the resource reallocation model considering schedule risk factors is reasonable.

    结果表明,考虑进度风险因素的优化模型是科学合理的。

    youdao

  • Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.

    因此,在研发项目实施之前开展进度风险分析十分必要。

    youdao

  • The schedule risk is an important risk during new equipment development, which correlates with plan technique and other factors.

    进度风险是新装备研制面临的重要风险之一,它与计划、技术等因素密切相关。

    youdao

  • Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.

    在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。

    youdao

  • Facilitating communication regarding the project scope, schedule, risk, performance, cost etc with the stakeholders throughout the project life cycle.

    便于在整个项目生命周期中,对项目范围,进度,风险,绩效,成本等问题与项目干系人沟通。

    youdao

  • This thesis on 165mn press installation project quality, schedule, risk control, thus pointing out the general process of installing a large press, and the installation of process control.

    本论文通过对165MN压机安装项目中质量、进度、风险控制的论述,揭示大型压机安装的一般性过程,以及在安装过程中的项目控制方法。

    youdao

  • This thesis on 165mn press installation project quality, schedule, risk control, thus pointing out the general process of installing a large press, and the installation of process control.

    本论文通过对165MN压机安装项目中质量、进度、风险控制的论述,揭示大型压机安装的一般性过程,以及在安装过程中的项目控制方法。

    youdao