Channel construction is a dynamic process and a high-risk project.
渠道建设是一个动态的过程,是高风险的项目。
High risk project approval must be safe production as a pre condition.
高危项目审批必须把安全生产作为前置条件。
I know, but I didn't want to risk the project going down the drain.
我知道,但我不想冒让这个项目泡汤的风险。
Without Project Hope, there is a risk that many children would have an unhappy future.
如果没有希望工程,许多孩子的未来就有可能不幸福。
It is a risk that occurs in any project.
它是在任何项目中都会出现的风险。
Risk management is an important part of project management.
风险管理是项目管理的一个重要组成部分。
Risk management is an obvious goal for every project.
风险管理是每个项目的明确目标。
In this method, the relationship of risk management and the key project measurements is tenuous.
在此方法中,风险管理和关键项目测量的关系是纤细的。
But each project also has a level of risk associated with it.
但每个项目都会有与其相关的级别的风险。
Project management: Cost, schedule, risk, staffing, and so forth.
项目管理:成本、时间表、风险、人员分配等等。
Project risk was highest at the start.
项目风险在项目开始时是最大的。
Different interpretations of the same term increase the risk of failed project delivery.
对同一术语有不同的解释会增加项目交付失败的风险。
This form of support can be a risk for big project.
所以对于大型项目来说,这种形式的支持存在风险。
Clients and developers wanted to attack risk soon in the project.
客户和开发者都想尽快消除项目中的风险。
Adopting this approach unifies risk management and project governance.
采用此方法将风险管理与项目治理统一起来。
Adopt iterative development practices that reduce project risk.
采取些减少项目风险的反复开发实践。
Such a project will require project management, with well-defined plans, estimates, and associated risk management.
这样的项目需要项目管理、良好定义的计划、评估和关联的风险管理。
Figure 9: The project lifecycle can be divided into three risk stages.
图9:项目生命周期可以分为三个风险阶段。
On the contrary, a risk is some condition that adds to project variance.
反之,风险是向项目方差中加入的某个条件。
And finally, the desire to minimize risk does not typically drive a waterfall project.
最后,想要最小化风险就不要使用一个典型瀑布型方法来驱动开发项目。
Project success is closely linked to opportunity and risk.
项目的成功与机遇和风险紧密的联系在一起。
It follows that it is precisely risk removal activities that remove the project variance.
由此可见,去掉项目偏差是准确地风险去除活动。
The aggressive California gull is putting a San Francisco Bay restoration project at risk.
凶猛的海鸥正在危及加利福尼亚州旧金山湾的自然修复工程。
Project scoping and initial risk assessment of data conversion effort.
项目范围界定和对数据转换工作的初始风险评估。
Figure 1: Expected risk profile for an iterative project.
图1:迭代的项目中预期风险的概况。
Figure shows risk reduction and value increase over course of project.
项目周期期间的风险降低(红色曲线)和价值创造(绿色曲线)。
Project cost and schedule cannot be finalized without completing risk management.
没有完成风险管理之前,项目成本和进度无法最终确定。
Prepare project management for some project, control project schedule, control project cost and down project risk.
参与部分项目的项目管理工作,把控项目进度,控制项目成本,降低项目风险;
Every possible risk has been provided for in this project.
此项方案对各种可能发生的风险都作了准备。
It is the value reference for the risk management of software project.
论文的工作对中小型软件项目的风险管理提供了有价值的参考。