Provide up-dated line capacity information to Hangzhou APS.
及时向杭州APS中心更新产能的相关信息。
Manages the capacity plans and identifies out of balance line capacity.
管理产量计划与确定产线能力。
Firstly the bus stop that limited the bus transit line capacity is studied.
首先对制约城市公交线路通行能力的公交车站进行研究。
Production line capacity statistics, deliver improvement idea and proposal accordingly;
生产线产能分析,制定改进方案。
Total CPU capacity (the blue line).
总cpu容量(蓝线)。
With 500 tonnage traffic capacity, Zhangjing River is a golden line for water transport.
张泾河通航能力达500吨,是水上运输的“黄金要道”。
Next year another 100,000 tons production capacity production line will also be put into production.
明年还有100,000吨的生产能力的生产线也将投入生产。
The line can give full play to capacity.
可以充分发挥线路的通过能力。
Therefore, the width of regulation line and the water level are depended on transport capacity.
因此,其整治水位与整治线宽度的确定,是与悬移质泥沙冲淤平衡的挟沙力所决定。
Therefore, the width of regulation line and the water level are depended on transport capacity.
因此,其整治水位与整治线宽度的确定,是与悬移质泥沙冲淤平衡的挟沙力所决定。
应用推荐