Provide up-dated line capacity information to Hangzhou APS.
及时向杭州APS中心更新产能的相关信息。
Firstly the bus stop that limited the bus transit line capacity is studied.
首先对制约城市公交线路通行能力的公交车站进行研究。
Production line capacity statistics, deliver improvement idea and proposal accordingly;
生产线产能分析,制定改进方案。
The Dynamic Thermal Circuit Rating (DTCR) of the transmission lines can be considered as the calculation basis for the increase of the transmission line capacity.
输电线动态热容等级DTCR可用作提高输电线路的传输容量的核算依据。
By taking S001 body production line as an example, the normal procedure of body line Capacity improvement is discussed, and some critical steps are also pointed out.
结合某车型(下称S001)车身生产线提速的例子,阐述实施车身生产线提速的一般过程,并表达了须要注意的主要事项。
By taking S001 body production line as an example, the normal procedure of body line Capacity improvement is discussed, and some critical steps are also pointed out.
结合某车型(下称S001)车身生产线提速的例子,阐述实施车身生产线提速的一般过程,并表达了须要注意的主要事项。
应用推荐