They typically demand 20% up front, a further 60% during construction, and the final 20% payment upon delivery.
他们象征性的收取20%的预付款,在造船期间收取另外的60%,交付的时候收取最后20%。
The final version of "Health Front" that was presented included two modes: activity and assistance.
在小组展示中,“常生”包括“活动”与“协助”两个模式。
The final version of "Health Front" that was presented included two modes: activity and assistance.
在小组展示中,“常生”包括“活动”与“协助”两个模式。
应用推荐