必要时对地基承载力进行验算。
If necessary, checking computations of foundation bearing capacity should be done.
疲劳验算首先要涉及应力分析。
The stress analysis is the first importance in the fatigue assessment.
最后通过验算证明了本设计的可行性。
验算盾构施工关键参数。
本文给出了启动时间和电机功率的验算方法。
The paper presents how to check starting time and motors power.
让我们来验算一下。
联合验算点是并联结构体系可靠度分析中的一个重要概念。
The joint design points is an important concept in reliability analysis of parallel structure systems.
这样的经验算是个小小的奇迹,而且是很少城市能够提供的。
This experience is a small miracle that few cities can offer.
结合现行抗震设计规范对网壳结构进行了“二阶段”抗震验算。
The "two stage" seismic check is done according to the current code of seismic design.
结合现行抗震设计规范对网壳结构进行了“二阶段”抗震验算。
The "two stage"seismic check is done through the current code of seismic design.
结合现行抗震设计规范对网壳结构进行了“二阶段”抗震验算。
The "two stage"seismic check is done through the current code of seismic design.
应用推荐