The influence of load hoisting acceleration on dynamic forces is obvious, especially on dynamic bending moment of the main boom.
结论吊重起升加速度对起重机动载荷的影响较大,特别对主臂内的动弯矩的激励更加明显。
The crane disposes of a 40 meter (132 ft) main boom, a newly developed two-man cab and a novel counterweight system that may be supplemented on site.
本起重机配40米(132英尺)主臂,新开发的双人司机室和一个新颖的可在现场安装的配重系统。
The crane disposes of a 40 meter (132 ft) main boom, a newly developed two-man cab and a novel counterweight system that may be supplemented on site.
本起重机配40米(132英尺)主臂,新开发的双人司机室和一个新颖的可在现场安装的配重系统。
应用推荐