main-boom 主帆桁
Main Boom m 主臂
main boom down 落下主臂
Main boom assembly 主臂总成
main boom extension 主臂延伸臂
boom main control valve 动臂主控制阀
boom main control valve schematic 动臂主控制阀简图
The influence of load hoisting acceleration on dynamic forces is obvious, especially on dynamic bending moment of the main boom.
结论吊重起升加速度对起重机动载荷的影响较大,特别对主臂内的动弯矩的激励更加明显。
The crane disposes of a 40 meter (132 ft) main boom, a newly developed two-man cab and a novel counterweight system that may be supplemented on site.
本起重机配40米(132英尺)主臂,新开发的双人司机室和一个新颖的可在现场安装的配重系统。
应用推荐