• The tenth cycle core of GNPS is the second cycle with 18-month fuel cycle after increasing fuel enrichment.

    大亚湾核电站循环提高燃料组件富集度实现18个月燃料循环的第二个循环堆芯。

    youdao

  • The work organizing process integrated with risk analysis of Guangdong Daya Bay Nuclear Power Station (GNPS) is depicted.

    描述贯穿于广东大亚湾核电站日常工作组织过程始终的风险分析概念方法。

    youdao

  • Having taken a firm step in localizing nuclear power equipment GNPS gives a boost to the overall improvement of capability of China's nuclear power industry.

    实现核电国产化道路上迈出了坚实一步带动我国核电产业整体能力提升;

    youdao

  • GNPS begins to implement the 18-month fuel cycles from the initial annual reload at cycle 9, thus the initial core thermal hydraulic design is not valid any more.

    大亚湾核电站第九循环开始换料向18个月换料转换,使得堆芯热工水力设计不再适用

    youdao

  • The information of nuclear accident in the Chernotyl power plant was described and the radioactive waste release and the operation experience in GNPS were recommended.

    简要回顾了切尔诺贝利核电站事故影响教训,结合广东大亚湾核电站放射性物质排放情况和运行经验,提出有关核电安全建设的建议

    youdao

  • The reload strategy is from 12 months to 18 month of GNPS, the fuel assembly changed from AFA 2g to AFA 3g and core nuclear data been changed, thus many accidents need to be reanalyzed.

    大亚湾核电站由年换料改为18月换料,燃料组件AF A2g改为afa3g,堆中子学参数发生了较大变化因此需要许多事故重新进行分析。

    youdao

  • The reload strategy is from 12 months to 18 month of GNPS, the fuel assembly changed from AFA 2g to AFA 3g and core nuclear data been changed, thus many accidents need to be reanalyzed.

    大亚湾核电站由年换料改为18月换料,燃料组件AF A2g改为afa3g,堆中子学参数发生了较大变化因此需要许多事故重新进行分析。