The tenth cycle core of GNPS is the second cycle with 18-month fuel cycle after increasing fuel enrichment.
大亚湾核电站第十循环堆芯是自提高燃料组件富集度后实现18个月燃料循环的第二个循环堆芯。
The work organizing process integrated with risk analysis of Guangdong Daya Bay Nuclear Power Station (GNPS) is depicted.
描述了贯穿于广东大亚湾核电站日常工作组织过程始终的风险分析的概念和方法。
Having taken a firm step in localizing nuclear power equipment GNPS gives a boost to the overall improvement of capability of China's nuclear power industry.
在实现核电国产化的道路上迈出了坚实的一步,带动了我国核电产业整体能力的提升;
GNPS begins to implement the 18-month fuel cycles from the initial annual reload at cycle 9, thus the initial core thermal hydraulic design is not valid any more.
大亚湾核电站从第九循环开始由年换料向18个月换料转换,使得原堆芯热工水力设计不再适用。
GNPS begins to implement the 18-month fuel cycles from the initial annual reload at cycle 9, thus the initial core thermal hydraulic design is not valid any more.
大亚湾核电站从第九循环开始由年换料向18个月换料转换,使得原堆芯热工水力设计不再适用。
应用推荐