• The forced air cooling device for 600MW unit after shutdown is introduced.

    介绍了600MW机组停机后的空气强制冷却装置,并对其使用中的操作步骤;

    youdao

  • The forced air cooling device for 600mw unit after shutdown is introduced. The operation procedures, noteworthy points, effect after the device putting into service are described in detail.

    介绍了600MW机组停机后的空气强制冷却装置,并对其使用中的操作步骤;注意事项;投入使用后的效果进行了详细的阐述。

    youdao

  • In this paper, the operation process of variable-parameter shutdown and forced cooling of300 MW units in Mawan Power Station is described at length.

    详细介绍了深圳妈湾发电厂机组滑参数停机、制冷却的方法及过程。

    youdao

  • In this paper, the operation process of variable-parameter shutdown and forced cooling of300 MW units in Mawan Power Station is described at length.

    详细介绍了深圳妈湾发电厂机组滑参数停机、制冷却的方法及过程。