• Engineers will conduct a block by block inspection of the monument's exterior over the next five days.

    未来五天,工程人员将逐一认真检查纪念塔的外部。

    youdao

  • Non-watertight weld joints and fillet welding for stiffening member shall be painted after block inspection.

    加强构件的非水密焊接接合和填角焊应该在检查完分段后进行喷漆。

    youdao

  • All scaffold should be marked by blue marker before block final inspection, and the marker should be round and easily found.

    大厦最终检查之前,所有的脚手架应该用蓝色记号标出,记号应呈圆形且易于发现。

    youdao

  • Block in the transport process protection coatings to avoid mechanical damage. If suffer much, the all mechanical damage should be repaired before final inspection.

    分段在运送过程中注意保护外壳的涂层,尽量避免机械损伤;若有较多的机械碰伤,必须在分段完工前修补结束后方可报验。

    youdao

  • Can identify suspect parts and nonconformity parts during inspection and make a mark for whole lot. Should block suspect lots and report to TQ engineer and supervisor.

    在检验过程中能鉴别可疑产品和不合格产品,并对可疑批次进行标识锁定,及时报告产品质量工程师和生产线主管。

    youdao

  • Can identify suspect parts and nonconformity parts during inspection, and make a mark for whole lot. Should block suspect lots and report to TQ en.

    在检验过程中能鉴别可疑产品和不合格产品,并对可疑批次进行标识锁定,及时报告产品质量工程师和生产线主管。

    youdao

  • Inspection scheme of offshore platform structure ultrasonic phased array was also presented, and the reference block of offshore platform structure was detected by this system.

    提出海洋平台结构超声相控阵检测方案,并使用该系统在对比试件上进行试验。

    youdao

  • Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).

    No1压载水舱(No.15分段)气压试验(压头试验)检查。

    youdao

  • Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).

    No1压载水舱(No.15分段)气压试验(压头试验)检查。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定