• 基于武器装备全寿命费用分解结构基础上,运用工程法对导弹的全寿命费用进行预测构建了详细的预测方法

    Based on the life cycle cost analysis, this paper forecasted the life cycle cost of the missile through Engineering cost method, and constructed detail forecast methods.

    youdao

  • 属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用监视控制

    The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.

    youdao

  • 属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用监视控制

    The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定