为此,首先在PBS的基础上进行费用分析,建立费用分解结构(Cost Breakdown Structure , CBS)。CBS的基础是费用组成结构,反映了对应于项目的费用管理的层次结构。
基于10个网页-相关网页
基于武器装备全寿命费用分解结构的基础上,运用工程费用法对导弹的全寿命费用进行了预测,构建了详细的预测方法。
Based on the life cycle cost analysis, this paper forecasted the life cycle cost of the missile through Engineering cost method, and constructed detail forecast methods.
属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用,监视和控制。
The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.