• A study by the Rand Corporation found that "a doubling in the number of [nuclear] reactors [built by an architect-engineer] results in a 5% reduction in both construction time and capital cost".

    兰德公司(RandCorporation)研究发现,“(建筑工程师)制造()反应堆数量增加倍,所需的制造时间资金成本下降5%。”

    youdao

  • This work has attracted the attention of efficiency experts and time-and-motion-study engineer, but its value goes far beyond that.

    这项工作引起专家时间效率关注动作,研究工程师价值远不仅于此。

    youdao

  • This work has attracted the attention of efficiency experts and time-and-motion-study engineer, but its value goes far beyond that.

    这项工作引起专家时间效率关注动作,研究工程师价值远不仅于此。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定