A study by the Rand Corporation found that "a doubling in the number of [nuclear] reactors [built by an architect-engineer] results in a 5% reduction in both construction time and capital cost".
兰德公司(Rand Corporation)的研究发现,“(建筑工程师)制造的(核)反应堆数量增加一倍,所需的制造时间和资金成本下降5%。”
This work has attracted the attention of efficiency experts and time-and-motion-study engineer, but its value goes far beyond that.
这项工作引起了专家和时间效率的关注与动作,研究工程师,但它的价值远不仅于此。
应用推荐