Water release structure of Maopingxi brook is one of TGPs important projects.
茅坪溪泄水建筑物是三峡工程的重要施工项目之一。
After 1998 flood, people are concerned about the influence of TGPs flood control regulation on the sedimentation in the reservoir.
1998年洪水后,人们关心三峡工程的防洪作用以及防洪调度对库区泥沙淤积的影响。
This paper introduces the in situ model test results on the technology for the TGPs soil rock cofferdam compacted by underwater blasting.
介绍了在三峡工程原位开展高土石围堰水下爆炸压实技术研究的模型试验情况。
This paper introduces the research results on numerical stress strain analysis and centrifuge model test for the TGPs high soil rock cofferdam.
介绍了应用数值分析和离心模型试验方法对三峡深水高土石围堰进行应力变形研究的成果。
The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.
三峡工程第三期截流工程是确保实现初期围堰挡水发电及同时修建右岸大坝和电厂的关键性工程。
The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.
三峡工程第三期截流工程是确保实现初期围堰挡水发电及同时修建右岸大坝和电厂的关键性工程。