Step 14. Installing Sysvinit and start-stop daemon.
第14步:安装Sysvinit和start - stopdaemon。
Step 14: Rotate it back 90 degrees clockwise and turn the top layer back on.
步骤14:将它顺时针旋转90度,打开顶部图层可见性。
Step 14 Select the Custom Shape Tool (U) and create an arrow shape inside the rounded rectangle using the color #e8e0c8.
步骤14选择自定形状工具创建一个箭头形状在刚才的圆角矩形中,颜色: #e8e0c8。
But at 14:20:26, the WIP administrator demoted the step out of production, and therefore the schedule became inactive.
但是在14:20:26,wip管理员会将该步骤从生产级别降级,该调度因而就变成非活动的了。
Figure 14 shows the output of this step.
图14展示了这一步的输出。
In the above example, we realize that the step scheduled to run on 2003-05-09 at 19:40 did not run because the WIP administrator decided to issue a run Now command on that edition at 14:16:04.
在上面的示例中,我们了解到计划在2003-05-09的19:40运行的步骤没有运行,因为WIP管理员决定在14:16:04就向该版本发出RUNNow命令。
In Listing 14, the execute method first obtains the number of rows of parameters that are input to the step.
在清单14中,execute方法首先获取输入到步骤的参数的行数。
Listing 14 shows the complete example of the table step for the HelloWorldTask.
清单14显示了HelloWorldTask的表步骤的完整示例。
Every 12 - to 14-hour shift would leave them exhausted, and understandably, my father had little desire to step foot in our own kitchen.
每天12至14小时的工作带给他们的是疲惫和理解,我的父亲几乎不愿踏进我们家的厨房半步。
As shown in Figure 14, click the output TAB of the Regroup Step to show the output schema structure.
如图14所示,单击Regroup Step的Output选项卡以便显示输出架构结构。
The window for Step 4, Map security roles to users/groups, displays as shown in figure 14. Do the following
将显示窗口Step4,Mapsecurityroles tousers/groups,如图 14 所示。
Figure 14 and Figure 15 shows step by step on how to view WPARs on IBM Director console.
图14和图15分步显示如何在IBMDirector控制台中查看WPAR。
But more importantly, the transfer of 14 shareholding enterprises COSCO assets should be part of integrated operations, the Group is also listed as a whole a key step in the process.
但更重要的是,14个股份制企业中远集团的资产转让应当是综合行动的一部分,工作组还作为一个整体在这个过程中关键的一步上市。
But more importantly, the transfer of 14 shareholding enterprises COSCO assets should be part of integrated operations, the Group is also listed as a whole a key step in the process.
但更重要的是,14个股份制企业中远集团的资产转让应当是综合行动的一部分,工作组还作为一个整体在这个过程中关键的一步上市。
应用推荐