• Construction procedure calculations are important parts of the design of cable-stayed Bridges.

    斜拉桥施工过程受力计算斜拉桥设计重要组成部分

    youdao

  • At present, the widely used box section beam, rigid frame, cable-stayed Bridges and other structures.

    目前箱型截面广泛应用于连续梁、连续刚构斜拉桥等桥梁结构中。

    youdao

  • Finally, the prospect of composite materials utilized in great span cable stayed Bridges is predicted.

    最后本文还展望了复合材料跨度斜拉桥中的应用前景。

    youdao

  • During the past decades, cable-stayed Bridges have found wide application, especially in western Europe.

    过去数十年中斜拉桥得到广泛应用特别是欧洲

    youdao

  • The ultimate load of cable-stayed bridges is determined by the failure path of structure under the dead load.

    自重荷载作用斜拉桥极限承载力与结构失效路径有关;

    youdao

  • This paper enumerates the present situation of over 30 cable-stayed Bridges which have been built in the world.

    本文列出了世界上建成30座斜拉桥情况

    youdao

  • There is no exact answer in bridge design regulation for efficient width of main girder for cable stayed bridges.

    斜拉桥桥面结构有效宽度桥梁设计规范没有明确给出。

    youdao

  • Win and torsion resistances are two key points in the structural analysis of large -span monocable stayed Bridges.

    抗风抗扭跨度单索面斜拉桥结构分析中的关键问题

    youdao

  • Movable scaffolding equipment mainly used in continuous beam Bridges is initially applied in Gonghe cable-stayed Bridges.

    滑动模架法主要应用连续梁桥主梁施工中,而在斜拉桥中的首次应用在公和斜拉桥中。

    youdao

  • Up to date, when designing the reasonable cable forces of cable-stayed Bridges, the special Bridges design process is adopted.

    目前,在进行斜拉桥合理状态设计,通常都采用专用桥梁设计程序

    youdao

  • This paper develops a practical and user-friendly approach for real-time service load condition assessment of cable-stayed bridges.

    宁波招宝山大桥例,介绍了一种新的斜拉桥后期荷载受力状态评估方法

    youdao

  • Numerical analysis draws the general conclusions on the parametric sensitivity about dynamic characteristics of cable-stayed Bridges.

    通过斜拉桥数值分析,得到了关于斜拉桥动力参数敏感性一般结论

    youdao

  • The control of girder geometry and internal forces is very important in the construction of pre-stressed concrete cable-stayed Bridges.

    预应力混凝土斜拉桥施工过程主梁线形结构内力控制非常重要

    youdao

  • There are few RC single-tower cable-stayed bridges with connected tower and separated decks in internal and international bridge engineering.

    混凝土斜拉桥采用联塔幅的结构型式在国内外均属少见。

    youdao

  • The results show that the variation of the stochastic variables has a different influence to the structural responses of cable-stayed Bridges.

    算例研究表明,各种随机变量变异斜拉桥结构响应影响规律不同

    youdao

  • Affected by various factors, the whole or part of the stay cables of some cable-stayed Bridges have to be replaced after a period of operation.

    斜拉桥由于因素影响,致使部分斜拉桥运营段时间需要全部部分更换斜拉索。

    youdao

  • Calculation essence of reasonable cable force is equivalent to optimization calculation on force status of cable-stayed Bridges under dead weight.

    合理索力计算实质斜拉桥恒载受力状态优化计算。

    youdao

  • Experimental vibration measurement is one of the most widely used methods for tension evaluation and condition assessment of cable-stayed Bridges.

    振动测试法斜拉桥索力测定、监测状态评估中应用广泛一种方法

    youdao

  • The cable-girder anchorage zones of cable-stayed Bridges, which bear giant cable forces and have complicated structure, are keys to structure design.

    斜拉桥索梁锚固结构区域受力集中、构造复杂控制设计关键部位。

    youdao

  • In cable-stayed Bridges the force and structure in pylon-cable anchorage area are more complex. The area belongs to a key part in a cable-stayed bridge.

    斜拉桥中塔锚固受力结构都比较复杂属于斜拉桥中的关键部位

    youdao

  • The treatment of mass matrix, the stiff matrix, the damp matrix and the dynamic model of cable-stayed Bridges in the analysis concluded in this research.

    讨论大跨度斜拉桥动力分析质量矩阵刚度矩阵阻尼矩阵处理方法以及斜拉桥动力分析模型的建立方法。

    youdao

  • At last, correctness of the design methods about fatigue strength via the fatigue experimental results of two partially cable-stayed Bridges are verified.

    通过座部分斜拉桥拉索疲劳试验结果验证了本文介绍疲劳强度设计方法正确性

    youdao

  • Rain wind induced cable vibration in cable stayed Bridges is presently a problem of great concern in communities of bridge engineering and wind engineering.

    拉索风雨激振当前桥梁工程和风工程界非常关注研究课题

    youdao

  • The primary damage identification based on in-situ test results constitutes an important process for the safety assessment of in-service cable-stayed bridges.

    为了对运营中的斜拉桥进行安全性评估,首先需要根据测试结果结构损伤进行初步识别

    youdao

  • So, to study the seismic responses of long-span cable-stayed Bridges with multi-support excitation will be very important to seismic design and seismic safety.

    因此斜拉桥多点输入下反应开展研究,对进行正确有效的抗震设计,确保其抗震安全性具有非常重要的意义。

    youdao

  • This paper is concentrated on the space geometric non-linear static analysis and vibration analysis of the long span plate-truss composite cable-stayed bridges.

    本文针对跨径板桁结合斜拉桥空间几何非线性静力分析结构动力分析两个方面而展开研究工作的。

    youdao

  • The anchorage zone of the pylon is a key part for cable-stayed Bridges, where the concentrated force of cable will be transferred to the pylon safely and uniformly.

    塔·拉索锚固斜拉桥关键部位,拉集中通过这一部位安全、均匀地传递塔柱中。

    youdao

  • The thesis deals with a theory and some research on key technologies of construction control of PC cable-stayed bridges. A software for general use is also developed.

    本文研究对象混凝土斜拉桥施工控制系统,主要工作是施工控制理论核心技术的研究以及施工控制系统软件开发

    youdao

  • According to the demand of wind-resistance analysis for the Bridges, a full set of practical method of flutter time analysis is brought forward for cable-stayed Bridges.

    根据桥梁抗风计算需要提出一整套斜拉桥抖振时域分析实用方法

    youdao

  • According to the demand of wind-resistance analysis for the Bridges, a full set of practical method of flutter time analysis is brought forward for cable-stayed Bridges.

    根据桥梁抗风计算需要提出一整套斜拉桥抖振时域分析实用方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定