long Span Cable-Stayed Bridges 大跨径斜拉桥
RC cable-stayed bridges RC斜拉桥
pc cable-stayed bridges 预应力混凝土斜拉桥
pc cable stayed bridges 预应力混凝土斜拉桥
concrete cable-stayed bridges 混凝土斜拉桥
long-span cable-stayed bridges 大跨度斜拉桥
low tower cable-stayed bridges 矮塔斜拉桥
The primary damage identification based on in-situ test results constitutes an important process for the safety assessment of in-service cable-stayed bridges.
为了对运营中的斜拉桥进行安全性评估,首先需要根据实桥测试结果对结构损伤进行初步识别。
The ultimate load of cable-stayed bridges is determined by the failure path of structure under the dead load.
在自重荷载作用下,斜拉桥极限承载力与结构的失效路径有关;
There is no exact answer in bridge design regulation for efficient width of main girder for cable stayed bridges.
斜拉桥的桥面结构有效宽度在桥梁设计规范中没有明确给出。
应用推荐