In the past years, many pile foundation inspection methods have been invented, including static pile trialing and dynamic pile trialing.
多年来,工程技术人员探究了许多桩基检测方法,包括静力试桩法和动力试桩法等。
The construction of static pressure is to press the pile into the soil with reaction force provided by the static pile driver weight, and balance weight on the rack.
静压法施工是通过静力压桩机的压桩机构以压桩机自重和机架上的配重提供反力而将桩压入土中的沉桩工艺。
The rationality and accuracy of this method are demonstrated in a comparison of the pile capacity calculated with this method and the results of static pile load test.
通过计算的桩极限承载力与静载结果的良好可比性,说明了此方法的合理性与准确性。
The plan of rock-bolt static pile rectifying deviation treatment has been accepted on the basis of investigation and geological exploration and the analysis of cracking reasons.
进行调查与勘察后,分析其产生开裂的原因,并提出采用锚杆静压桩纠偏治理的方案。
This Paper Puts forward an automatic level coned system of static pile driver's body by using electro-hydraulic proportional technique to solve the difficult level control problem.
本文针对静力压桩机调平困难的问题,提出了一种采用电液比例控制技术设计的压桩机的机身自动调平系统。
A hydraulic vibratory system is developed for vibratory pile pressing. It can produce variable pressure with a specified frequency in hydraulic circuit for hydraulic static pile pressing machine.
为液压静力沉桩机液压系统的压桩油路中产生一定频率压力变化,实现振动压桩而研发了一套液压振动系统。
The problem of crane overload protection of the hydraulic static pile driving machine is originally solved by a full hydraulic project through comparison and demonstration in advance in this paper.
本文针对这一实际工程问题在静力压桩机吊机过载机理分析的基础上,通过方案的比较论证,首创性地提出了液压静力压桩机吊机过载保护问题的全液压解决方案。
To achieve real time automatic levelling and vertical rise up and fall down of the static pile driver′s case, an electro hydraulic levelling system is designed for the static pile driver based on PLC.
为使静力压桩机在工作过程中能够实现实时自动保持机身水平与水平升降,设计了一种基于PLC的压桩机电液自动调平系统。
The compression of the pile in the pile group can be determined by static load test. The settlement of the pile toe is calculated by layer wise summation method.
群桩中桩身压缩由单桩静载试验得到的桩顶沉降与桩端沉降之差求得,群桩的桩端沉降由分层总和法计算。
In this article, the author analyzes the causes of abnormal static load test of pipe pile in soft soil stratum, puts forward reasonable advices from design and construction aspect.
对软土地质条件下管桩静载荷试验异常原因进行研究分析,从设计和施工角度提出了合理建议。
Distributive regularities of inner force of pile under static and dynamic load, the change of pile's side resistance, and settlement of piles are analyzed by static and dynamic load test.
通过单桩竖向抗压静载试验和动载试验,分析了静动载对桩身轴力分布、桩身侧摩阻力和基桩沉降的影响及其变化规律。
Static load experiment is the most basic and reliable method for ensure single pile bearing force.
静载荷试验是确定单桩承载力方法中最基本、最可靠的方法。
Static analysis is not enough to project design. Therefore, transverse dynamic characteristics of pile foundation have increasingly been taken into account.
仅仅从静力角度的分析已不能满足工程设计的要求,桩基的横向动力特性已受到了越来越普遍的关注。
In this method, the static resistance at pile toe can be calculated directly with the rebound at pile top and impulse duration from the acceleration signal at pile top.
在该公式中,桩端土的静阻力可以直接从桩顶的加速度信号中获得的桩顶回弹和冲击力持续时间计算得到,并且计算结果和土阻尼无关。
In this article, the bearing capacity behavior and load transfer mechanism of super long bored pile in Wenzhou soft clay are discussed, on the basis of the static loading test and axial force test.
通过温州软土地基中超长钻孔灌注桩静载荷试验和桩身轴力的测试,探讨了软土地基中超长钻孔灌注桩的承载力性状和荷载传递机理。
By using a complete engineering example, this paper gives the data of static load test and the data of settlement observation of treated single pile and single pile complex foundation respectively.
文章介绍了一个完整的工程实例,并给出了处理后的单桩和单桩复合地基静载荷试验数据和沉降观测数据。
Engineers tried to adopt the anchor rod static pressure pile technology in design of tower crane foundations and this technology can improve synthetical benefit of projects.
针对这一情况,尝试在塔式起重机基础中应用锚杆静压桩,这对提高工程综合效益具有较大的意义。
With more and more high-rise constructions have been builded, the static load test of pile is adopted as the foremost way to identify vertical ultimate bearing capacity of single pile.
随着高层及超高层建筑的涌现,桩基静载试验作为确定单桩极限承载力最可靠的方法已被广泛采用。
This article makes an introduction of a simple and reliable method to determine single pile static load by adoption of fast load-keeping method in order to verify calculation of R.
以快速维持荷载法测定单桩静载荷,来检验钢筋混凝土预制方桩的设计计算,是一种简捷和较为可靠的方法。
Static press anchored pile is a kind of pile which combined of anchored pile and static press pile.
锚杆静压桩是锚杆和静压力桩相结合而形成的一种桩基础。
Based on the model of elastic-plastic mechanics, this paper presents the conception of equivalent ultimate settlement of single pile, which is studied with results of static loading tests on piles.
本文根据弹塑性力学模型,提出了单桩等效极限位移的概念,并结合桩的静载试验成果,对其进行了分析探讨。
Bearing mechanism, loading transfer behavior and results of FEM simulation of squeezed branch pile are analyzed systematically in this paper based on results of static loading test.
根据单桩静载荷试验的结果,全面系统地分析了挤扩支盘桩的承载机理、荷载传递性状和FEM模拟结果。
The self-Balanced method is a new technologies of foundation pile static load test, vertical compression pile is closer to the actual working conditions of a test method.
自平衡试桩法是一种基桩静载试验新技术,是接近于竖向抗压桩实际工作条件的一种试验方法。
Gravel pile; Composite foundation; Static load test; Pile-soil stress ratio.
碎石桩;复合地基;静载荷实验;桩土应力比。
On the base of lots of pile test results of static test and centrifugal model test, a load transfer function of side resistance of super-long pile considering depth effect is put forward.
在分析了大量单桩静载试验和一些离心模型试验结果的基础上,分别针对超长单桩的桩侧、桩端承载特性进行了理论分析。
Statistics through a large number of static load pile tests shows that hammer-driven pedestal piles through granite residual soil have advantages in their bearing capacity and cost.
通过对大量静载试验成果的统计,证明花岗岩残积上中夯扩桩在承载能力与造价上的优势。
The static load test for the large bored pile in bridge engineering was presented in this paper.
介绍了一大型桥梁钻孔灌注桩静载试验。
Determining soil calculation parameters is one of key problems in numerical simulation of single pile static test.
单桩静载试验数值模拟的关键问题之一是确定各土层的计算参数。
Through the new investigation and design the static bolt pile reinforcement is adopted.
经过重新勘察设计,决定采用锚杆静压桩加固此危房。
The system is helpful to raise efficiency and quality of then pile static loading test.
系统的应用有助于提高桩基静载荷检测的效率和质量。