In the past years, many pile foundation inspection methods have been invented, including static pile trialing and dynamic pile trialing.
多年来,工程技术人员探究了许多桩基检测方法,包括静力试桩法和动力试桩法等。
The construction of static pressure is to press the pile into the soil with reaction force provided by the static pile driver weight, and balance weight on the rack.
静压法施工是通过静力压桩机的压桩机构以压桩机自重和机架上的配重提供反力而将桩压入土中的沉桩工艺。
The rationality and accuracy of this method are demonstrated in a comparison of the pile capacity calculated with this method and the results of static pile load test.
通过计算的桩极限承载力与静载结果的良好可比性,说明了此方法的合理性与准确性。
应用推荐