• Example: One of your duties was doing staff scheduling, and you solved a big scheduling problem.

    例如:你的一项职责就是安排员工的工作,而你解决了一项很大的安排问题。

    youdao

  • The vehicle-scheduling problem with time window is also a NP-hard problem being more complicated than VSP.

    带有时间窗的车辆优化调度问题是比VSP复杂程度更高的NP难题。

    youdao

  • It provides a suitable mathematical model for solving the scheduling problem.

    它为解决调度问题提供了一个较好的数学模型。

    youdao

  • Flow-shop scheduling problem is known to be notoriously intractable, both in theory and practice.

    流水作业调度问题在理论和实践方面均是一个著名的难题。

    youdao

  • Simulation results show that the proposed approach can solve the aircraft scheduling problem effectively.

    实验结果表明,该方法能够有效求解飞机排班问题。

    youdao

  • Timetabling is also called the scheduling problem.

    排课表问题又称时间表问题。

    youdao

  • A scheduling problem with rejection has been researched.

    研究了工件可拒绝排序问题。

    youdao

  • The DAG scheduling problem has shown to be NP complete in general.

    一般情况下,这种DAG调度是个NP完全问题。

    youdao

  • The boiler steam system cyclic scheduling problem was investigated.

    对锅炉蒸汽系统循环调度问题进行了研究。

    youdao

  • The performance measure of the scheduling problem is schedule length.

    排序问题的性能测度是排序长度。

    youdao

  • The single machine scheduling problem with continuous resources is discussed.

    讨论具有连续资源的单机排序问题。

    youdao

  • This paper considers the parallel machine scheduling problem with delivery times.

    本文考虑了带传递时间的平行机排序问题。

    youdao

  • It is proved that ACA is efficient and robust in solving transit scheduling problem.

    证明了改进蚁群算法解决公交调度问题的高效性和较强的适用性。

    youdao

  • Research on theories and methods of scheduling problem is a kind of NP - complete problems.

    生产调度理论与方法研究是一类NP完全问题。

    youdao

  • Two kinds of model are formulated based on the studies of job shop fuzzy scheduling problem.

    在研究作业车间模糊调度问题的基础上,建立了两种作业车间模糊调度模型。

    youdao

  • It is very difficult for solving the planning and scheduling problem because of its complexity.

    由于计划调度问题本身的复杂性,很难寻求到最优解。

    youdao

  • A single machine-scheduling problem with fuzzy delays and mixed precedence relations is discussed.

    分析了一类带有模糊时间延迟和混合优先关系的单机调度问题。

    youdao

  • Resource-constrained project scheduling problem is a typical issue in project scheduling management.

    资源约束项目调度问题是项目进度管理中的典型问题。

    youdao

  • A discrete Particle Swarm Optimization (PSO) algorithm was presented for Job Shop scheduling problem.

    提出了用于解决作业车间调度问题的离散版粒子群算法。

    youdao

  • The job shop scheduling problem is a classical problem with both highly theoretical and practical value.

    工件车间调度问题具有很高的理论价值和实际价值。

    youdao

  • This paper studies the so called two-stage cross docking logistics scheduling problem and its algorithms.

    本文主要研究两阶段越库物流作业调度问题及其算法设计。

    youdao

  • The test results demonstrate the effectiveness of the RHSA to solve the dynamic vehicle scheduling problem.

    测试结果验证了算法在求解动态车辆调度问题中的有效性。

    youdao

  • The possible presence of clouds is the main origin of uncertainty in the multi satellites joint scheduling problem.

    在多星联合调度过程中,存在着很多不确定性因素,其中云层覆盖变化是主要的不确定性来源。

    youdao

  • Vehicle scheduling problem with full-loads has long been a hot research issue in logistics & transportation industry.

    满载车辆调度问题是物流运输领域中一个非常值得研究的问题。

    youdao

  • The port tugboat operation scheduling is a kind of parallel machines scheduling problem with special process constraint.

    港口的拖轮调度过程是一类带特殊工艺约束的并行多机调度问题。

    youdao

  • The port tugboat operation scheduling is a kind of parallel machines scheduling problem with special process constraint.

    港口的拖轮调度过程是一类带特殊工艺约束的并行多机调度问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定