The DAG scheduling problem has shown to be NP complete in general.
一般情况下,这种DAG调度是个NP完全问题。
We show that the scheduling problem is NP-hard in the strong sense.
本文证明了上述排序模型是强NP困难的。
The first problem is the fuzzy flexible job shop scheduling problem.
第一类问题为模糊柔性作业车间调度问题。
The performance measure of the scheduling problem is schedule length.
排序问题的性能测度是排序长度。
Production scheduling problem has been shown to be a NP complete problem.
经证明,生产调度问题是NP完全问题。
The dramatic characteristic of the job shop scheduling problem is its complexity.
车间调度问题的突出特点是其复杂性。
It is very difficult for solving the planning and scheduling problem because of its complexity.
由于计划调度问题本身的复杂性,很难寻求到最优解。
The second problem is the fuzzy flexible job shop scheduling problem with preventive maintenance.
第二类问题为具有预防性维修的模糊柔性作业车间调度问题。
Resource-constrained project scheduling problem is a typical issue in project scheduling management.
资源约束项目调度问题是项目进度管理中的典型问题。
Resource-constrained project scheduling problem is a typical issue in project scheduling management.
资源约束项目调度问题是项目进度管理中的典型问题。
应用推荐