According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
On Thursday (July 8) BP said its operation to drill a new relief well to stop the Deepwater Horizon leak was ahead of schedule.
周四(7月8日),英国石油公司表示,他们为了停止“深水地平线”继续漏油而打钻的一口新的减压油井将提前完成。
The result shows that the institutional factors determine that the behaviors of multinational operation incline to be ahead of the schedule.
研究发现,中国企业面临的制度环境决定了处于转轨经济时期的中国企业在跨国经营方面具有提前的趋势。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
Production schedule takes a very important position in the operation management activities of enterprises.
生产计划在企业经营管理活动中具有非常重要的地位。
To conduct inspection to the building as per schedule and advise of conditions which might affect the operation of the hotel as well as any potential safety hazards.
有计划的开展饭店设施检查工作,当发现有安全隐患或设施存在问题有可能影响正常运做时必须及时上报。
With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.
将项目全寿命周期中影响现金流的建设阶段和运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型。
On the basis of communication operation schedule for system matrix formed with basis cycle, the time synchronization of system was obtained depending on the net time unit (NTU).
传输操作时刻表由基循环组成的系统矩阵为基础,时间间隔尺度以网络时间单元为单位实现时间同步。
The intelligent schedule of vehicles operation is one of the problems which needs to be solved in the public transportation intelligent dispatch.
运营车辆的智能排班是公交车辆智能调度需要解决的问题之一。
A wick lighter, when tested in accordance with section 12 of the schedule, must not exhibit rupture of its fuel reservoir or any other damage that could affect its safe operation.
根据附录第12部分测试过的带芯打火机,不能存在燃料箱破裂或任何其他可能影响安全操作的损坏。
According to a work schedule automatic management system of operation, no artificial attendant.
可根据工作计划表自动管理系统的运行,无需人工值守。
The users shall report the monthly balance status so that the accountant to confirm operation schedule of each item and deal with the items lagged bahind.
由使用者通报月结状态,以利会计确认每一项目作业进度,实时处理落后项目。
The assignment of a schedule is that according to produce goal and restriction to arrange the detailed process line, time, machine and operation etc.
调度的任务是根据生产目标和约束,为每个加工对象确定具体的加工路线、时间、机器和操作等。
The infrared hotbox detection system that has being used in the railway transportation field in China has the problem of low reliability. That is one reason to influence train's operation on schedule.
我国铁路运用现场应用的红外线轴温探测系统存在兑现率低等问题,对列车的正点运行造成了较大的影响。
The operation of the original schedule arrangement can be executed ahead of time if the odour experiment goes smoothly.
如果气味实验顺利,原来计划的日程可以提前。
The effects of pre-operative interview are affected by work load, operation schedule, nurse's talent and coordination between the Operating Room and the clinical wards.
访视效果与手术室工作量、排班方式、手术室护士素质以及手术室与病房工作协调运转有关。
The key problem of designing the operation schedule for public transit lines is to determining the departing time interval.
编制车辆的运行时刻表的关键问题是确定发车间隔。
Once the device is turned on successfully, you can send a variety of operation commands to it (see the Schedule button commands) to complete the assigned task.
一旦设备打开成功,就可以向它发出各种操作命令(见附表的按钮命令)来完成指定的工作任务。
Take charge of project schedule, quality, progress and accomplishment, lay down, adjust and control the operation of the project.
负责项目的工作计划进度、质量、进度和目标完成情况,具体制定、调整和控制项目运行;
Using a variety of methods and measures to control the programs to ensure that the project carried out by the master plan and project operation can be realized on schedule.
同时采取了及时有效的纠偏措施,运用了多种方法和措施控制了进度,确保了该项目按总体计划进行并按期实现项目投产。
Excavation scheme is determined accordingly, which can satisfy the requirement of operation of large machines, reduce the construction cost and ensure the construction schedule.
该方案满足大型机械施工条件,能大大提高效率,且为确保工期,降低工程造价创造了条件。
Excavation scheme is determined accordingly, which can satisfy the requirement of operation of large machines, reduce the construction cost and ensure the construction schedule.
该方案满足大型机械施工条件,能大大提高效率,且为确保工期,降低工程造价创造了条件。
应用推荐