... schedule graph 计划进度表 schedule of operation 操作程序 Schedule of Passengers Service 客船运行班期表 ...
基于40个网页-相关网页
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
On Thursday (July 8) BP said its operation to drill a new relief well to stop the Deepwater Horizon leak was ahead of schedule.
周四(7月8日),英国石油公司表示,他们为了停止“深水地平线”继续漏油而打钻的一口新的减压油井将提前完成。
The result shows that the institutional factors determine that the behaviors of multinational operation incline to be ahead of the schedule.
研究发现,中国企业面临的制度环境决定了处于转轨经济时期的中国企业在跨国经营方面具有提前的趋势。
应用推荐