• The delay estimation and compensation are key problems in real-time substructure testing because the delay of servo-hydraulic loading system may induce failure due to experimental instability.

    在实时子结构试验中,液压伺服加载系统的时滞可能导致试验因丧失稳定而失败,因而时滞估计和补偿是该类试验的关键问题之一。

    youdao

  • Based on the original research findings of the high order single step integration algorithm, a new algorithm for the high order single step real-time substructure testing was put forward.

    本文在前人早期高阶单步逐步积分算法研究成果的基础上,提出了一种新的高阶单步实时动力子结构试验算法。

    youdao

  • Based on the original research findings of the high order single step integration algorithm, a new algorithm for the high order single step real-time substructure testing was put forward.

    本文在前人早期高阶单步逐步积分算法研究成果的基础上,提出了一种新的高阶单步实时动力子结构试验算法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定