• In the course of the production in mine, the production plan of mine is of great importance.

    矿井生产过程,矿井生产计划有着重要的作用。

    youdao

  • The input-output analysis method has been applied to production-management plan of mine in this paper.

    投入产出分析法应用矿山,编制矿山生产经营计划

    youdao

  • The Udachnaya Pipe is a diamond mine inRussia. The owners of the mine plan to cease its operations in 2010 -in favor of underground mining.

    俄罗斯钻石矿主计划于2010年停止采矿,这样将有利于地下开采

    youdao

  • The owners of the mine plan to cease its operations in 2010 - in favor of underground mining.

    由于更倾向于地下采矿,场主决定2010年结束这里采矿工作

    youdao

  • The draft of coal mine excavation plan is typically an unhealthy structural and complex tech economic problem.

    矿井采掘计划的编制典型不良结构复杂技术经济问题

    youdao

  • It is advantageous to the management of production and selecting reasonable plan in mine design.

    从而有利于生产管理矿井设计选用合理方案

    youdao

  • The improvement plan, work principles and reform result on electric control system of main shaft hoist in Linhuan Coal Mine are introduced, and the result is fine.

    介绍了煤矿提升机电系统改造方案工作原理改造效果,经过改造后电控系统效果良好。

    youdao

  • This paper introduced several views of fulfilling excavation plan, which can be a reference for mine plan and field management people.

    本文介绍了完成采掘计划几点意见,可供从事矿山计划管理现场管理人员参考

    youdao

  • Optimization of mine design plan is a multisystem incompatible problem.

    矿井设计优选一个多系统不相容问题。

    youdao

  • Based on the analysis of occurrence state of its products, a rational flowsheet is given, thus providing a new technical plan for building Zunyi Manganese Mine.

    通过产品赋存状态分析提出合理选别流程为遵义锰矿建设提供了新的技术方案

    youdao

  • Based on the analysis and discussion of intensified mining and how to carry on it, the selection, implementing and application of intensified mining plan in Anqing Copper Mine are introduced.

    强化开采技术以及如何实现强化开采进行分析探讨基础介绍了安庆铜矿强化开采工艺方案选择实施应用

    youdao

  • The paper introduces the current situation of the power supply system in Wulan Coal Mine, and following the general plan of tapping the northern potential by Ningxia Coal Mining Group Co.

    本文介绍乌兰煤矿供电系统现状按照宁夏煤业集团公司“北部挖潜”战略总体部署对供电系统作出的改造方案

    youdao

  • This paper introduced the design plan and application effect of new type cage bar in Kangjiawan Mine, Shuikoushan Bureau of Mines.

    介绍水口山矿务局康家湾副井罐笼内新型阻车器设计方案及其应用效果

    youdao

  • A colleague of mine got married two years ago but still has no plan of starting a family. Work remains her greatest source of pride.

    有个同事前年结婚了,目前尚无生育计划工作仍旧是生活里最得意项目;

    youdao

  • The state of power supply in Hegang Coal Mine Bureau is introduced, and the reform plan is also put forward.

    介绍了鹤岗矿务局选煤厂供电现状,提出供电系统改造方案。

    youdao

  • Subject has researched system design plan, which is based on GIS technology, safety in production of the mine and rescue of the accident in the mine as main function.

    研究了以GIS技术为基础,以矿山安全生产井下事故救援主要功能的系统设计方案

    youdao

  • The paper described the development plan, the selection of seam location and the arrangement methods of main roadway in Jinchang Coal Mine from the designing aspect under present geological condition.

    现有矿井地质条件下,设计方面论述晋昶煤矿开拓方案选择大巷层位设计大巷布置方式

    youdao

  • In view of site selection for ore transport system in mine, general plan optimization method of main production logistics system in mine was discussed in combination with engineering design examples.

    针对矿山工程设计物流系统选址问题,结合工程实例探讨矿山主要生产物流系统设计的优化方法

    youdao

  • In the course of the production in mine, the production plan.

    矿井生产过程,矿井的生产计划有着重要的作用。

    youdao

  • Weaving excavate and grub supersedure plan is means of dealing with connection of excavate and grub in mine production , and is chief and basal work.

    编制采掘计划处理采掘关系决策手段,也是其首要基础性工作

    youdao

  • According to the geologic investigation of out patient building of Malan mine worker's hospital the cement grout reinforcement plan is adopted.

    马兰职工医院门诊地质勘察资料分析为依据,确立了采用水泥灌浆加固方案

    youdao

  • The information of Object-oriented classification could meet the plan production and application of mine remote sensing survey.

    面向对象分类结果信息可以满足矿山遥感调查生产应用

    youdao

  • Weaving excavate and grub supersedure plan is means of dealing with connection of excavate and grub in mine production, and is chief and basal work.

    编制采掘接替计划处理采掘关系决策手段也是首要基础性工作

    youdao

  • Base on the existing disadvantages of the conventional charging method for the mine battery charging device, the paper provided a charging current control plan with a fuzzy control ideal.

    针对矿用蓄电池充电装置常规充电方法存在缺陷提出基于模糊控制思想的充电电流控制方案

    youdao

  • At present coal resources in high tension and the rapid moving of the mine activities, it is necessary to have a plan and mine the coal pillars.

    当前资源趋紧、接替紧张情况下,煤柱进行规划开采十分必要。

    youdao

  • Aimed at factors to influence the aquatic environment, the paper put forward measures of water source protecting during coal mining, regulating coalmine exploitation plan and mine...

    针对影响环境变化因素提出开展采煤保水研究、调整矿山开发规划水污染治理的措施

    youdao

  • The plan and technology of skip loading chamber construction in Jining No. 2 Coal Mine are introduced.

    介绍了济宁煤矿箕斗装载硐室施工方案技术

    youdao

  • Through comparing calculation of two plan which are mining overall height in one times and shise mining, the optimum one suitake for thick coal seam mining in Dongrong No. 3 Coal Mine is determined.

    通过分层开采两个方案比较计算,功定了适合东荣三矿煤层开采的最佳方案。

    youdao

  • Abstract: : In view of the Xinjiang some copper mine ore nature characteristic, carries on the different plan acid pickling small experiment separately.

    罙要:针对新疆铜矿矿石性质特点分别进行不同方案小型试验

    youdao

  • Abstract: : In view of the Xinjiang some copper mine ore nature characteristic, carries on the different plan acid pickling small experiment separately.

    罙要:针对新疆铜矿矿石性质特点分别进行不同方案小型试验

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定