In the course of the production in mine, the production plan of mine is of great importance.
在矿井的生产过程中,矿井的生产计划有着重要的作用。
The Udachnaya Pipe is a diamond mine inRussia. The owners of the mine plan to cease its operations in 2010 -in favor of underground mining.
这是俄罗斯一处钻石矿,矿主计划于2010年停止采矿,这样将有利于地下开采。
The owners of the mine plan to cease its operations in 2010 - in favor of underground mining.
由于更倾向于地下采矿,矿场主决定在2010年结束这里的采矿工作。
The draft of coal mine excavation plan is typically an unhealthy structural and complex tech economic problem.
矿井采掘计划的编制是典型的不良结构和复杂的技术经济问题。
The improvement plan, work principles and reform result on electric control system of main shaft hoist in Linhuan Coal Mine are introduced, and the result is fine.
介绍了临涣煤矿主井提升机电控系统的改造方案、工作原理及改造效果,经过改造后的电控系统效果良好。
This paper introduced several views of fulfilling excavation plan, which can be a reference for mine plan and field management people.
本文介绍了完成采掘计划的几点意见,可供从事矿山计划管理及现场管理人员等参考。
Based on the analysis of occurrence state of its products, a rational flowsheet is given, thus providing a new technical plan for building Zunyi Manganese Mine.
通过对产品赋存状态的分析,提出了合理的选别流程,为遵义锰矿的建设提供了新的技术方案。
Based on the analysis and discussion of intensified mining and how to carry on it, the selection, implementing and application of intensified mining plan in Anqing Copper Mine are introduced.
在对强化开采技术以及如何实现强化开采进行分析和探讨的基础上,介绍了安庆铜矿强化开采工艺方案的选择、实施及应用。
The paper introduces the current situation of the power supply system in Wulan Coal Mine, and following the general plan of tapping the northern potential by Ningxia Coal Mining Group Co.
本文介绍了乌兰煤矿供电系统的现状,按照宁夏煤业集团公司“北部挖潜”战略的总体部署对供电系统作出的改造方案。
This paper introduced the design plan and application effect of new type cage bar in Kangjiawan Mine, Shuikoushan Bureau of Mines.
介绍了水口山矿务局康家湾矿副井罐笼内新型阻车器的设计方案及其应用效果。
A colleague of mine got married two years ago but still has no plan of starting a family. Work remains her greatest source of pride.
有个同事前年结婚了,目前尚无生育计划,工作仍旧是她生活里最得意的项目;
The state of power supply in Hegang Coal Mine Bureau is introduced, and the reform plan is also put forward.
介绍了鹤岗矿务局选煤厂供电现状,提出了供电系统改造方案。
Subject has researched system design plan, which is based on GIS technology, safety in production of the mine and rescue of the accident in the mine as main function.
研究了以GIS技术为基础,以矿山安全生产和井下事故的救援为主要功能的系统设计方案。
The paper described the development plan, the selection of seam location and the arrangement methods of main roadway in Jinchang Coal Mine from the designing aspect under present geological condition.
在现有矿井地质条件下,从设计方面论述了晋昶煤矿的开拓方案、选择大巷层位及设计大巷布置方式。
In view of site selection for ore transport system in mine, general plan optimization method of main production logistics system in mine was discussed in combination with engineering design examples.
针对矿山工程设计中物流系统的选址问题,结合工程实例探讨了矿山主要生产物流系统设计的优化方法。
Weaving excavate and grub supersedure plan is means of dealing with connection of excavate and grub in mine production , and is chief and basal work.
编制采掘计划是处理采掘关系决策的手段,也是其首要的和基础性的工作。
According to the geologic investigation of out patient building of Malan mine worker's hospital the cement grout reinforcement plan is adopted.
以马兰矿职工医院门诊楼地质勘察资料的分析为依据,确立了采用水泥灌浆的加固方案。
The information of Object-oriented classification could meet the plan production and application of mine remote sensing survey.
面向对象分类结果图的信息可以满足矿山遥感调查的生产应用。
Weaving excavate and grub supersedure plan is means of dealing with connection of excavate and grub in mine production, and is chief and basal work.
编制采掘接替计划是处理采掘关系决策的手段,也是其首要的和基础性的工作。
Base on the existing disadvantages of the conventional charging method for the mine battery charging device, the paper provided a charging current control plan with a fuzzy control ideal.
针对矿用蓄电池充电装置常规充电方法存在的缺陷,提出了基于模糊控制思想的充电电流控制方案。
At present coal resources in high tension and the rapid moving of the mine activities, it is necessary to have a plan and mine the coal pillars.
在当前资源趋紧、接替紧张的情况下,对煤柱进行规划和开采十分必要。
Aimed at factors to influence the aquatic environment, the paper put forward measures of water source protecting during coal mining, regulating coalmine exploitation plan and mine...
针对影响水环境变化的因素提出开展采煤保水研究、调整矿山开发规划、矿水污染治理的措施。
The plan and technology of skip loading chamber construction in Jining No. 2 Coal Mine are introduced.
介绍了济宁二号煤矿箕斗装载硐室施工方案及技术。
Through comparing calculation of two plan which are mining overall height in one times and shise mining, the optimum one suitake for thick coal seam mining in Dongrong No. 3 Coal Mine is determined.
通过一次采全高和分层开采两个方案的比较计算,功定了适合东荣三矿厚煤层开采的最佳方案。
Abstract: : In view of the Xinjiang some copper mine ore nature characteristic, carries on the different plan acid pickling small experiment separately.
摘罙要:针对新疆某铜矿矿石性质特点,分别进行不同方案酸浸小型试验。
The problems existed in electric supply protection for coal mine are introduced, and the features and result of the computerisation reform plan are provided.
介绍了煤矿供电保护存在的问题,提出了微机化改造方案的特点、效果等。
Aiming at researching the construct of enterprise resource plan (erp) to enhance the competitiveness of metal mine, the particularity and theory of erp in metal mines are analyzed and studied deeply.
文章以金属矿山企业资源计划构建,提高金属矿山企业竞争力研究为目的。分析了金属矿山企业ERP系统建设的理论基础和金属矿山企业应用erp的特殊性。
In view of the Xinjiang some copper mine ore nature characteristic, carries on the different plan acid pickling small experiment separately.
针对新疆某铜矿矿石性质特点,分别进行不同方案酸浸小型试验。
In view of the Xinjiang some copper mine ore nature characteristic, carries on the different plan acid pickling small experiment separately.
针对新疆某铜矿矿石性质特点,分别进行不同方案酸浸小型试验。
应用推荐