• The loading process is designed on the basis of the cracking and yielding loads and earthquake action as calculated for seismic load of fortification intensity.

    根据计算的各抗震设防烈度对应的地震作用及开裂荷载、屈服荷载设计出加载制度; 采用液压伺服装置进行低周反复荷载试验。

    youdao

  • The loading process is designed on the basis of the cracking and yielding loads and earthquake action as calculated for seismic load of fortification intensity.

    根据计算的各抗震设防烈度对应的地震作用及开裂荷载、屈服荷载设计出加载制度; 采用液压伺服装置进行低周反复荷载试验。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定