The loading process is designed on the basis of the cracking and yielding loads and earthquake action as calculated for seismic load of fortification intensity.
根据计算的各抗震设防烈度对应的地震作用及开裂荷载、屈服荷载设计出加载制度; 采用液压伺服装置进行低周反复荷载试验。
The loading process is designed on the basis of the cracking and yielding loads and earthquake action as calculated for seismic load of fortification intensity.
根据计算的各抗震设防烈度对应的地震作用及开裂荷载、屈服荷载设计出加载制度; 采用液压伺服装置进行低周反复荷载试验。
应用推荐