Parpal dumplin was first discovered in a place called the Cromer Shoal Chalk Beds as part of a project called Seasearch.
Parpal dumplin首次发现于一个叫做克罗默浅滩白垩质河床的地方,它的发现是一个叫做“海洋研究”项目的一部分。
Tasks fulfill Requests in the context of a project.
任务在一个项目的环境下实现请求。
At the onset of a project, nothing is known for sure.
在项目的开始,不能确定任何事。
It is located in the top-level folder of a project.
这个文件位于项目顶级文件夹中。
Scripts and data pools need to exist inside of a project.
脚本与数据池需要存在于项目之内。
Integration is not one "big bang" at the end of a project.
集成不是在项目的尾声进行的“大动作”。
A Solution can contain only one version of a project asset.
解决方案只能包含项目资产的一个版本。
The hierarchy of a project remains visible in the project Explorer.
在项目浏览器中仍然可以见到一个项目的层级结构。
We start with the beginnings of a project structure (see Figure 2).
我们从一个项目结构来开始(如图2所示)。
First, as part of a project to map what we know about knowledge.
首先,作为‘描绘我们所了解知识’项目的一部分。
The actual business model which outlines the blueprint of a project.
勾勒项目蓝图的实际商业模型。
Therefore, effective testing is essential to the success of a project.
因此,有效的测试是一个项目获得成功的关键因素。
Quantify lets you measure the performance characteristics of a project.
Quantify让您能够度量项目的性能特征。
The header files are modified only rarely during the scope of a project.
在一个项目的范围内,很少对头文件进行修改。
These people could envision the final system from the outset of a project.
这些人可以通过工程的外观而预见到最终的系统。
It is good sense to spend time at the start of a project in fixing problems.
所以,在项目开始时花点时间来解决问题是明智的。
The Recovery Protocol is a good tool to use at the beginning of a project.
恢复协议是在项目开始时使用的很好的工具。
In this article we will use an online bookstore as an example of a project.
在本文我们使用一个在线书店作为项目的一个例子。
The key advantage of Open Source Software is during the early stages of a project.
开源软件的关键优势是在项目的前期阶段。
In some workflows, you might have models stored within subfolders of a project.
在相同的工作流程中,您可能要建模项目子文件夹之内存储的模型。
It serves as the backing storage for the in-memory translation memory of a project.
它为项目的内存翻译记忆进行备份储存。
Each project artifact of a project area belongs to exactly one of its team areas.
项目区域的每个项目构件确切地仅属于其中一个团队区域。
For example, the cost, effort, and duration of a project are at best educated guesses.
例如,最好也不过是有根据地推测项目的成本、工作及持续时间。
Fourth, balance project plans and associated estimates with the uncertainty of a project.
第四,在项目的不确定性和项目计划以及相关估计中取得平衡。
The failure of a software project becomes more likely as the size of a project increases.
随着项目规模的增长,软件项目越发变得容易失败了。
However, the experience of an architect always has a bearing on the success of a project.
无论如何,设计时的经验总是会关系到项目的成败。
Any of these parties may call for evaluation at any stage of a project if deemed necessary.
这些方面的任何一方如果认为需要,可要求在某一项目的任何阶段进行评价。
Developing use cases is a significant step in the requirement gathering phase of a project.
确定用例是项目的需求收集阶段的重要一步。
Depending on the nature and size of a project, you may actually do the AAR after completion.
根据项目的特性和规模大小您可决定是否在完成以后才做aar。
Depending on the nature and size of a project, you may actually do the AAR after completion.
根据项目的特性和规模大小您可决定是否在完成以后才做aar。
应用推荐