The company spend hundreds of man hour on meetings.
这个公司开会就要耗掉几百个工时。
The objective of our problem is to minimize the shortage of man hour for customer demands of various skills.
为了要使顾客的需求达到最大的满足,我们的目标是要找出一最佳排班表来使所缺乏的人力资源量为最少。
One man sits up in his bed for an hour each afternoon to help drain the fluid from his lungs.
男子每天下午在床上坐一个小时,以便排出肺部的液体。
On two separate morning visits to the scientists' lab, each man walked for an hour at an average speed that, in theory, should allow his body to rely mainly on fat for fuel.
在科学家的实验室里,每个人分别在上午的两次访问中,以平均速度走了一个小时,理论上,他的身体应该主要依靠脂肪作为燃料。
The sick man died within the hour, being torn with spasms and retchings.
病人因为痉挛和呕吐,在一个小时内就死了。
A man in camp took a barometer reading at half-hour intervals.
营地里的一个人每半小时看一次气压计。
One hour later, the young man was back.
一个小时后,年轻人回来了。
The man is driving as 40 kilometres an hour.
那人以每小时40公里的速度开车。
After an hour, a man rushed through the crowd to the artist and said, "I knew you were honest and would certainly come here."
过了一个小时,一个男人穿过人群冲到艺术家面前,对他说:“我知道你是诚实的,你一定会来的。”
About half an hour later, a middle-aged man rushed to Winston in a hurry and said, "It's you!"
大约半小时后,一个中年人急急忙忙跑到温斯顿跟前说:“就是你!”
An hour later, a man, marching amid trees and mists, was rapidly departing from M. sur M. in the direction of Paris.
一个钟头过后,有个人在树林和迷雾中大踏步离开了滨海蒙特勒伊向着巴黎走去。
There is no question that the Man of the Hour is now Tim Cook — Apple's man of the future.
毫无疑问,现在的风云人物是蒂姆·库克——苹果未来的主人。
Half an hour passed yet again; neither man, woman, nor child returned.
又过去了半个小时;男的、女的、老的、小的,谁都没有回来。
The previous record was held by an Indian man who delivered a 120-hour speech.
此前的纪录为120小时,由一个印度人创造。
Time-saving, highly effective, and reduces the labor intensity, basic may save man-hour of half, enhances labor productivity three times, is the outer wall construction most ideal equipment.
省时、高效,并且减轻劳动强度,基本可以节省工时一半,提高劳动生产率三倍,是外墙施工的最理想设备。
The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out the operation sheet and the process route sheet of a part.
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
The multiplier for the estimate of man-hour costs to take care of overheads and fringe benefits.
工时成本估计的乘数及以满足福利费和经营管理费的需要。
The production per man-hour is three units.
每人每个工作小时的产量是三单位。
This archetype system adopted modularization framework and had the following functions: automatically designing and editing coordination charts, calculating coordination accuracy and man-hour cost.
该系统采用模块化结构,具有自动设计协调图表、编辑协调图表、协调准确度计算和统计工时成本等功能。
Design and implementation of reasoning decision strategies. Reasoning decision strategies oriented to enterprise man-hour rationing level, is one of focus of this thesis.
推理决策的设计与实现策略面向企业级工时定额的推理决策方法是本文研究的重点。
The multiplier for the estimate of man-hour costs to take care of overheads and fringe benefits.
工时成本估计的乘数及以满足福利费和经营治理费的需要。
The application of HSE in Shanbei oil fields has ensured zero delay of man-hour, zero accident in the pit and zero apparatus and industrial accident in this working area.
健康安全环保(HSE)管理体系及其在陕北油田钻井中的应用,使该工区钻井达到了零误工时、无井下及设备事故以及没有工伤事故的目标。
It contributes to specialized Labour organization and can raise the operation proficiency and the availability of man-hour.
有利于专业化劳动组织,提高操作的熟练程度和工时利用率。
The structure frame of the man-hour quota calculation and its development for the civil aviation seats manufacturing are presented.
对民航座椅工时定额制定方法进行研究,建立了工时定额系统总体结构,并提出了其实现方法。
There are many difficulties in estimating the manufacturing cost and production cycle of the die in production quoting due to the uncertainty of the man-hour of die adjusting and testing.
针对由于汽车模具调试工时难以确定所导致的制造成本和生产周期与生产实际相差较大的问题,提出了基于工时管理系统的汽车模具调试工时估计方法。
Reasoning decision strategies oriented to enterprise man-hour rationing level, is one of focus of this thesis.
推理决策的设计与实现策略面向企业级工时定额的推理决策方法是本文研究的重点。
In order to estimate the assembly man-hour of a new product reasonably, the principle and corresponding algorithms of the similar case retrieval were proposed.
为了合理地估算船舶中间产品装配作业工时,提出了产品相似实例检索规则和算法。
Do not exceed 1 year, be in man-hour affirms. More than 1 year, affirm according to finishing plan.
不超过1年的,在完工时确认。超过1年的,按照完工进度确认。
New product development most high cost have, man-hour longest stage to make the physical model involved, namely prototype manufacture process.
新产品开发中成本最高、工时最长的阶段就是制造所涉及的物理模型,即原型制造过程。
New product development most high cost have, man-hour longest stage to make the physical model involved, namely prototype manufacture process.
新产品开发中成本最高、工时最长的阶段就是制造所涉及的物理模型,即原型制造过程。
应用推荐