The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out the operation sheet and the process route sheet of a part.
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
This archetype system adopted modularization framework and had the following functions: automatically designing and editing coordination charts, calculating coordination accuracy and man-hour cost.
该系统采用模块化结构,具有自动设计协调图表、编辑协调图表、协调准确度计算和统计工时成本等功能。
The structure frame of the man-hour quota calculation and its development for the civil aviation seats manufacturing are presented.
对民航座椅工时定额制定方法进行研究,建立了工时定额系统总体结构,并提出了其实现方法。
The application of HSE in Shanbei oil fields has ensured zero delay of man-hour, zero accident in the pit and zero apparatus and industrial accident in this working area.
健康安全环保(HSE)管理体系及其在陕北油田钻井中的应用,使该工区钻井达到了零误工时、无井下及设备事故以及没有工伤事故的目标。
In order to estimate the assembly man-hour of a new product reasonably, the principle and corresponding algorithms of the similar case retrieval were proposed.
为了合理地估算船舶中间产品装配作业工时,提出了产品相似实例检索规则和算法。
The invention increases the radiation effect of motor, extends the service life of the capacitor and motor, saves man-hour, and increases the efficiency of production.
本发明提高了电机的散热效果,延长电容器和电机的使用寿命,节省了加工工时,提高了生产效率。
The article confirms learning curve exists not only in the average bad rate, but also in the average man-hour, but the former progress rate is much larger than the latter.
文章不仅证实了在累计平均不良率上存在着学习效应,还证实了累计平均工时也存在着学习效应,但是前者的进步率要远大于后者。
The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out the operation sheet…
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out t…
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
There are many difficulties in estimating the manufacturing cost and production cycle of the die in production quoting due to the uncertainty of the man-hour of die adjusting and testing.
针对由于汽车模具调试工时难以确定所导致的制造成本和生产周期与生产实际相差较大的问题,提出了基于工时管理系统的汽车模具调试工时估计方法。
As an important basic work in enterprise, man-hour quota standard and its balance should be the key problem to be settled.
劳动定额作为企业—项重要的基础工作,其所要解决的关键问题是工时定额水平及其平衡性问题。
The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out the operat…
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
Hydraulic drive, low consumption of energy, less man-hour and high automation grade.
液压传动,耗能低,用工少,自动化程度高。
Hydraulic drive, low consumption of energy, less man-hour and high automation grade.
液压传动,耗能低,用工少,自动化程度高。
应用推荐