• A dated inspection label or other suitable identification of compliance must be affixed to each item upon passing the inspection by the assigned facility Tool Inspector.

    所有指定工厂工具检查员检查合格项目,都必须贴上注有日期的检查标签其他适用合格证

    youdao

  • The fourth item addresses an approach to validating the facility.

    第四提出了鉴定设备途径

    youdao

  • The hot-blast stove is an important auxiliary facility of the blast furnace and its building and lining engineering is a key item in the blast furnace system engineering.

    热风炉高炉重要附属设施,热风炉砌筑工程是高炉系统工程中的重点项目

    youdao

  • The hot-blast stove is an important auxiliary facility of the blast furnace and its building and lining engineering is a key item in the blast furnace system engineering.

    热风炉高炉重要附属设施,热风炉砌筑工程是高炉系统工程中的重点项目

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定