A dated inspection label or other suitable identification of compliance must be affixed to each item upon passing the inspection by the assigned facility Tool Inspector.
所有经指定的工厂工具检查员检查合格的项目,都必须贴上注有日期的检查标签或其他适用的合格证。
The hot-blast stove is an important auxiliary facility of the blast furnace and its building and lining engineering is a key item in the blast furnace system engineering.
热风炉是高炉的重要附属设施,热风炉砌筑工程是高炉系统工程中的重点项目。
The hot-blast stove is an important auxiliary facility of the blast furnace and its building and lining engineering is a key item in the blast furnace system engineering.
热风炉是高炉的重要附属设施,热风炉砌筑工程是高炉系统工程中的重点项目。
应用推荐