A dated inspection label or other suitable identification of compliance must be affixed to each item upon passing the inspection by the assigned facility Tool Inspector.
所有经指定的工厂工具检查员检查合格的项目,都必须贴上注有日期的检查标签或其他适用的合格证。
The fourth item addresses an approach to validating the facility.
第四项提出了鉴定该设备的途径。
Your item was processed through our ISC NEW YORK NY(USPS) facility on September 19, 2011 at 10:41 am. The item is currently in transit to the destination.
处理您的项目是2011年9月19日,在上午10时41分,通过我们的ISC纽约NY(USPS)的设施。该项目是目前在运输途中的目的地。
The hot-blast stove is an important auxiliary facility of the blast furnace and its building and lining engineering is a key item in the blast furnace system engineering.
热风炉是高炉的重要附属设施,热风炉砌筑工程是高炉系统工程中的重点项目。
The company has the advanced equipment, abundant technical force, high quality management, design, marketing talented person, consummation each item of necessary facility.
高素质的管理、设计、营销人才,完善的各项配套设施。
The company has the advanced equipment, abundant technical force, high quality management, design, marketing talented person, consummation each item of necessary facility.
高素质的管理、设计、营销人才,完善的各项配套设施。
应用推荐