The initial project risks are identified.
最初的项目风险也已经确定。
Our initial project structure is complete. The J2EE view of your workspace should look like Figure 3.
在完成了初始项目结构之后,工作台中的J2EE视图应该看起来如图3所示。
Since development is an iterative process, requirements definition does not end in the initial project-definition phase.
由于开发是个迭代的过程,所以需求定义并没有终止在初始的项目定义阶段。
Having an effective process assists in the initial project development, and insures that bug fixes can be deployed as quickly as the change can occur.
拥有有效的过程有助于最初的项目开发,并且可以保证随着变更的出现尽快地部署错误修补程序。
In the initial project design stage and during the pilot implementation stage, we faced several challenges related to making the move to topic-based, information-typed content development.
在最初的项目设计阶段和试验性实现阶段中,我们遇到了与转向基于主题的、信息类型化内容开发有关的一些挑战。
The initial project risks should be identified during project planning.
应在项目规划期间确定最初的项目风险。
You can see the difference between these three startup options in Figure 10-2, which shows the initial project set up for these three templates.
你可以在图10 - 2中看到这三个开始选项之间的差别,该图显示了这三个模板所建立的最初项目。
If you did a good job initially on defining requirements and on initial project planning, you will start your project with a well-de fined scope.
如果你的需求定义得很好,初始项目规划也做得很好,那么你的项目至少在开始的时候是有一个明确的范围的。
At the start of the initial project phase, the critical attributes are laid down. Based on these, the designers then produce the first proportional models for the new vehicle.
在最初项目的开始阶段,关键的属性被制定好。基于这些关键属性,设计师为新车制作第一个比例模型。
The initial project work: the controlling detailed plan, Environment Influence Assessment and the Geological Disaster Assessment have been completed. The main road has been started to build.
项目前期工作:已完成片区控制性详细规划、环境影响评估、地质灾害评估,开工建设主干道。
Initial project organization. The members of the project team, as well as stakeholders, are identified. The organization of the project is also documented.
项目初步组织。识别了项目团队的成员与利害关系者。项目的组织也形成了文件。
Initial project organization. The members of the project team, as well as stakeholders, are identified. The organization of the project is also documented.
项目初步组织。识别了项目团队的成员与利害关系者。项目的组织也形成了文件。
应用推荐