• The primary of the analysis include the lateral force in the top deck of box girder and the lateral force of the diaphragm beam on the pier.

    分析主要包括:箱梁顶板横向受力分析以及箱内横隔的横向受力分析。

    youdao

  • The rigid connection is installed at the top of the reinforced concrete pier, instead of the intersection part of steel girder and reinforced concrete pier.

    节点设置钢筋混凝土桥墩顶部而非目前常用的将其设置在钢梁钢筋混凝土桥墩交叉部的结构形式。

    youdao

  • The combined conversion beam consists of a steel box girder, concrete poured on the top of and in the steel box girder and a shearing resistant connector.

    组合转换钢箱梁浇筑钢箱梁顶部内部混凝土以及连接件构成。

    youdao

  • At the top flange there would be enough slack so that no relative twist of any significant magnitude would be introduced into the girder web.

    足够松动因而在主梁腹板上并不引起很大相对扭转

    youdao

  • The results showed that the pier, the top and the bottom plates of the main girder were all under compression.

    结果表明墩身主梁底板受压,强度、刚度都满足要求。

    youdao

  • Concrete is poured on the upper part inside the steel box in the span-center bending moment area to solve the problem of the insufficient pressing area of concrete on the top of the steel box girder;

    中正弯矩箱内上部浇筑混凝土解决钢箱梁顶部混凝土受压面积不足问题

    youdao

  • Visual observations showed that a horizontal displacement in the longitudinal direction of the bridge developed between the tie girder and the top flange of the floor beam at the end connection.

    肉眼观察表明在端节点处横梁之间产生一种沿桥梁纵向水平位移

    youdao

  • Visual observations showed that a horizontal displacement in the longitudinal direction of the bridge developed between the tie girder and the top flange of the floor beam at the end connection.

    肉眼观察表明在端节点处横梁之间产生一种沿桥梁纵向水平位移

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定