The primary of the analysis include the lateral force in the top deck of box girder and the lateral force of the diaphragm beam on the pier.
其分析主要包括:箱梁顶板的横向受力分析以及箱内横隔梁的横向受力分析。
The rigid connection is installed at the top of the reinforced concrete pier, instead of the intersection part of steel girder and reinforced concrete pier.
将刚节点部设置在钢筋混凝土桥墩的顶部,而非目前常用的将其设置在钢梁与钢筋混凝土桥墩交叉部的结构形式。
The combined conversion beam consists of a steel box girder, concrete poured on the top of and in the steel box girder and a shearing resistant connector.
该组合转换梁由钢箱梁、浇筑在钢箱梁顶部及内部的混凝土以及抗剪连接件构成。
应用推荐